Commissioning Results of the KSTAR Cryogenic System

نویسندگان

  • Y. S. Kim
  • Y. M. Park
  • Y. J. Lee
  • S. W. Kwag
  • Y. B. Chang
  • N. H. Song
  • I. S. Woo
  • H. T. Park
  • K. W. Cho
  • H. S. Chang
  • D. S. Park
  • J. J. Joo
  • K. M. Moon
  • K. R. Park
  • Y. Chu
  • H. Yonekawa
  • Y. O. Kim
  • E. N. Bang
  • H. K. Kim
  • K. P. Kim
  • M. K. Park
  • S. Baek
  • J. S. Hong
  • T. H. Ha
  • Y. J. Kim
  • I. S. Hwang
  • H. L. Yang
  • Y. K. Oh
  • J. S. Bak
  • M. Kwon
  • G. S. Lee
چکیده

The cryogenic system for the KSTAR superconducting magnets has been commissioned. It consists of a cold box, distribution boxes (DB) and cryogenic transfer lines. The cold box and DB #1 provide 600 g/s of supercritical helium to cool the superconducting (SC) magnets, their SC bus-lines, and the magnet support structures. It also provides 17.5 g/s of liquid helium to the current leads and supplies cold helium flow to the thermal shields. The cooling power of the cold box at 4.5 K equivalent is 9 kW which is extracted by 6 turboexpanders. The DB #1 includes 49 cryogenic valves, 2 supercritical helium circulators, 1 cold compressor, and 7 heat exchangers immersed in a 6 m 3 liquid helium storage bath. The main duties of the DB #2 are the relative distribution of the cryogenic helium among the cooling channels of each KSTAR cold component and the emergency release of over-pressurized helium during abnormal events such as quenches of the SC magnets. After individual commissioning, the system was integrated and cooled down with the KSTAR device. In this paper, the construction and commissioning results of the KSTAR cryogenic system will be introduced. In addition, we will present the cool-down results of the KSTAR device.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Overview of Recent Commissioning Results of KSTAR

KSTAR is an advanced tokamak with fully superconducting coils for the steady state plasma research. The detailed engineering design and infrastructure setup for R & D have been completed in 2001. In March 2008, after the construction period of seven years, the KSTAR assembly has been completed, by connecting the cryogenic transfer lines between the tokamak and the cryogenic distribution system....

متن کامل

Commissioning Results of the KSTAR Neutral Beam System

The neutral beam injection (NBI) system is designed to provide the ion heating and current drive for the high performance operation and long pulse operation of the Korean Superconducting Tokamak Advanced Research (KSTAR). The KSTAR NBI consists of two beam lines. Each beam line contains three ion sources of which one ion source has been designed to deliver more than 2.5 MW of deuterium neutral ...

متن کامل

KSTAR Assembly and Vacuum Commissioning for the 1 st Plasma

The Korea Superconducting Tokamak Advanced Research (KSTAR) device site assembly was completed by May 2007. During the assembly period, several key technologies were developed to assemble the superconducting tokamak and its ancillary systems. As will be described in this paper, we encountered several problems and difficulties that mainly stemmed from the uniqueness of the superconducting tokama...

متن کامل

Lessons Learned from KSTAR Construction and Commissioning

KSTAR is an advanced tokamak with fully superconducting coils for the steady state research, which began in December 1995 and was completed in July 2008. As a single science project, it has been marked as the largest construction project in the history of Korea. During the construction period, we encountered several challenges, such as technical issues, cost overrun and schedule slippage. Never...

متن کامل

Operation Results of KSTAR Integrated Control System for First Plasma

After the successful accomplishment of vacuum commissioning assisted by vacuum vessel baking and glow discharge cleaning, KSTAR had shifted to the cool-down phase in April 2, 2008 and completed cooling of all superconducting coils and structures down to the operation temperature of 4.5K for about a month by the helium refrigerator system with 9KW cooling capacity. For the next a month, all supe...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008