Nuclear Regulatory Commission Notice of Availability of Interim Staff Guidance Documents for Fuel Cycle Facilities
نویسنده
چکیده
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in these public meetings, or need this meeting notice or the transcript or other information from the public meetings in another format (e.g. braille, large print) please notify the NRC’s Disability Program Coordinator, Deborah Chan, at 301–415–7041, TTD: 301–415–2100, or by e-mail at [email protected]. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
منابع مشابه
Nuclear Regulatory Commission Sunshine Act Meeting Notice Nuclear Regulatory Commission Notice of Availability of Interim Staff Guidance Document for Fuel Cycle Facilities
reading-rm/doc-collections/ (ACRS & ACNW Mtg schedules/agendas). Videoteleconferencing service is available for observing open sessions of ACRS meetings. Those wishing to use this service for observing ACRS meetings should contact Mr. Theron Brown, ACRS Audio Visual Technician (301–415–8066), between 7:30 a.m. and 3:45 p.m., e.t., at least 10 days before the meeting to ensure the availability o...
متن کاملNuclear Regulatory Commission Notice of Availability of Draft Interim Staff Guidance Document for Fuel Cycle Facilities
The purpose of this notice is to provide the public an opportunity to review a draft ISG, FCSS–ISG–10, Revision 2, which provides guidance to NRC staff to determine whether the minimum margin of subcriticality is sufficient to provide an adequate assurance of subcriticality for safety to demonstrate compliance with the performance requirements of 10 CFR 70.61(d). Additionally, listing of commen...
متن کاملNuclear Regulatory Commission Notice of Availability of Model Application concerning Technical Specification Improvement to Revise Control Rod Notch Surveillance Frequency, Clarify Srm Insert Control Rod Action, and Clarify Frequency Example Background
need to prepare an environmental impact statement. Document Access and Management System (ADAMS), which provides text and image files of NRC's public documents. The ADAMS accession numbers for the documents related to this notice are as follows: Document ADAMS accession No. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the NRC's...
متن کاملNuclear Regulatory Commission Environmental Standard Review Plan
Environmental standard review plans are prepared for the guidance of the Office of Nuclear Reactor Environmental standard review plans are prepared for the guidance of the Office of Nuclear Reactor Environmental standard review plans are prepared for the guidance of the Office of Nuclear Reactor Environmental standard review plans are prepared for the guidance of the Office of Nuclear Reactor R...
متن کاملConsiderations on a Comparison of Integrated Safety Analysis to Probabilistic Risk Assessment
revising the fuel cycle oversight program directed staff to produce a concise paper that was a critical evaluation and comparison of Integrated Safety Analyses (ISA) and Probabilistic Risk Assessment (PRA). The SRM to SECY-10-0031 stated that the Commission expects the paper " to better inform proposed enhancements to the oversight process. " The following are NRC staff considerations for condu...
متن کامل