Case study on statistically estimating minimum makespan for flow line scheduling problems
نویسندگان
چکیده
Lower bounds are typically used to evaluate the performance of heuristics for solving combinatorial minimization problems. In the absence of tight analytical lower bounds, optimal objective-function values may be estimated statistically. In this paper, extreme value theory is used to construct confidence-interval estimates of the minimum makespan achievable when scheduling nonsimilar groups of jobs on a two-stage flow line. Experimental results based on randomly sampled solutions to each of 180 randomly generated test problems revealed that (i) least-squares parameter estimators outperformed standard analytical estimators for the Weibull approximation to the distribution of the sample minimum makespan; (ii) to evaluate each Weibull fit reliably, both the Anderson–Darling and Kolmogorov–Smirnov goodnessof-fit tests should be used; and (iii) applying a local improvement procedure to a large sample of randomly generated initial solutions improved the probability that the resulting Weibull fit yielded a confidence interval covering the
منابع مشابه
To appear, European Journal of Operational Research. Case Study on Statistically Estimating Minimum Makespan for Flow Line Scheduling Problems
Lower bounds are typically used to evaluate the performance of heuristics for solving combinatorial minimization problems. In the absence of tight analytical lower bounds, optimal objective-function values may be estimated statistically. In this paper, extreme value theory is used to construct confidence-interval estimates of the minimum makespan achievable when scheduling nonsimilar groups of ...
متن کاملMeta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times
This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...
متن کاملA novel mathematical model for a hybrid flow shop scheduling problem under buffer and resource limitations-A case study
Scheduling problems play a big role in manufacturing and planning the production for increasing the production efficiency and assigning the resources to operations. Furthermore, in many manufacturing systems there is a physical space between stages that called intermediate buffers. In this study, a model is proposed for minimizing the makespan of a hybrid flow shop scheduling problem with inter...
متن کاملA Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times
This paper presents a mathematical model for a flow shop scheduling problem consisting of m machine and n jobs with fuzzy processing times that can be estimated as independent stochastic or fuzzy numbers. In the traditional flow shop scheduling problem, the typical objective is to minimize the makespan). However,, two significant criteria for each schedule in stochastic models are: expectable m...
متن کاملA multi-exchange neighborhood for minimum makespan machine scheduling problems
We propose new local search algorithms for minimum makespan machine scheduling problems, which perform multiple exchanges of jobs among machines. Inspired by the work of Thompson and Orlin (1989) on cyclic transfer neighborhood structures, we model multiple exchanges of jobs as special disjoint cycles and paths in a suitably defined improvement graph, by extending definitions and properties int...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- European Journal of Operational Research
دوره 155 شماره
صفحات -
تاریخ انتشار 2004