An exploration of the relationship between business process redesign and information technology infrastructures

نویسنده

  • Victoria L. Mitchell
چکیده

It is generally recognized that an organization's information technology (IT) infrastructure can facilitate organizational change, particularly when the information needs of the business process are clearly defined and the capabilities of the IT infrastructure fully explored. Unfortunately, firms engaged in business process redesign (BPR) often struggle to meet these two conditions as outmoded design principles are being discarded for new patterns of activity (Hatnmer 1990). Prior research indicates that IT infrastructure decisions should be made in conjunction with a firm's business-thrust strategies (Boynton and Zmud 1987) and vice versa (Lederer and Mendelow 1986). An inadequate assessment of goals, capabilities and limitations tends to result in the adoption of iiicompatible BPR and IT strategies, inhibiting project rollout (MacDonald 1991). Frequently these project delays are indicative of an IT gap, in which BPR information resource needs exceed the capabilities of an IT infrastructure. Changes to either the intended process design or the IT infrastructure may be necessary for gap resolution. This study focuses on the strategies driving BPR projects and lT infrastructure development, the nature of IT-related project delays and the degree to which the redesign project or the IT infrastructure were altered to facilitate project implementation, A multi-phase research design strategy used comprehensive phone interviews, sets of three matched surveys and archival data to collect information on forty-three BPR projects and associated IT infrastructures. Principal components analysis provided discriminant validity for the BPR and IT strategy constructs, and a cluster analysis revealed three basic strategic orientations. Hierarchical log-linear models were used to assess the most likely outcomes (type of delay, duration, type of BPR and IT change) associated With different strategy combinations. The results suggest that a reactive BPR strategy coupled with a reactive IT strategy is least risky as IT-related project delays tend to be short, allhough unanticipated, with incremental changes to the intended business process and no change to the IT infrastructure. For all strategy combinations, changes to the IT infrastructure were likely to be less drastic than changes to the intended business process. Most IT-related project delays were unanticipated and relatively short (six months or less).

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Impact of Information Technology on Iran Distribution Company Performance in View of Organizational Infrastructures

The relationship between information technology investments and firm value as an area of inquiry has sustained interest among IS researchers over the past decade. Based on literature review of published work at corporate level productivity, researchers have developed three different approaches in assessing the correlation between IT implementation and productivity measures. Broadly speaking, th...

متن کامل

Information technology infrastructure, organizational process redesign, and business value: An empirical analysis

a r t i c l e i n f o We extend current research examining synergies between information technology, process redesign, and firm performance in three ways: analyze a firm's entire IT and BPR portfolio, examine production and market value performance implications, and conduct analysis using a unique dataset of 228 firms between 1996 and 1999. We find a contingent association between IT, process r...

متن کامل

Exploration of Relationship Between Usage of Information and Communication Technology (ICT) Tools and Critical Thinking Desposition Among Distance Education Students

One of the main objectives of the ICT-based education is training of critical thinking skills. Critical thinking is essential for a thouthful way of living and compatability to rapid social changes. The purpose of this study was to explore the relationship betweeen usage of ICT tools and critical thinking desposition among distance education students. The research was done through descriptive (...

متن کامل

Examine the Relationship between the Process-Oriented Organizations by Strategy Formation as a Formal Process

This article examines the role of management in business processes in relation to the process-oriented organization and strategy formation as a formal process (strategic planning). A questionnaire designed to measure these variables after the validity and reliability among a sample of 183 managers, officials and experts in working systems, information technology and strategic planning in major ...

متن کامل

Assessment of BAM with ANP Approach; Case Study: Bank Sepah

In today's business environment in which coordination and adaptation with constant changes are the only ways of survival, real-time monitoring of activities and making the decisions accordingly are necessary. Since performance measurement cannot be managed independent of business processes, Business Activity Monitoring (BAM) systems should monitor performance metrics based on business processes...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1993