Improving Accuracy in Earthwork Volume Estimation for Proposed Forest Roads Using a High-Resolution Digital Elevation Model

نویسندگان

  • Marco Contreras
  • Pablo Aracena
  • Woodam Chung
چکیده

Nacrtak Earthwork usually represents the largest cost component in the construction of low-volume forest roads. Accurate estimates of earthwork volume are essential to forecast construction costs and improve the financial control of road construction operations. Traditionally, earthwork volumes are estimated using methods that consider ground data obtained from survey stations along road grade lines. However, these methods may not provide accurate estimates when terrain variations between survey stations are ignored. In this study, we developed a computerized model to accurately estimate earthwork volumes for the proposed forest roads by using a high-resolution digital elevation model (DEM). We applied our model to three hypothetical forest road layouts with different ground slopes and terrain ruggedness conditions. We examined the effects of various cross-section spacings on the accuracy of earthwork volume estimation assuming that 1-meter spacing provides the »true« earthwork volume. We also compared our model results with those obtained from the traditional end-area method. The results indicate that as cross-section spacing increases the accuracy of earthwork volume estimation decreases due to lack of the ability to capture terrain variations. We quantified earthwork differences, which increased with terrain ruggedness ranging from 2 to 21%. As expected, short cross-section spacing should be applied to improve accuracy in earthwork volume estimation when roads are planned and located on hilly and rugged terrain.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Assessment Effect of the Spatial Resolution of Digital Elevation Model on Daily Discharge Estimation of Arazkuseh Watershed Using SWAT Model

The spatial quality of the Digital Elevation Model (DEM) has a great effect on the Soil and Water Assessment Tool (SWAT) semi-distributed model. The purpose of this study was to evaluate the effect of spatial accuracy of three DEMs with spatial resolutions of 10, 50 and 200 m on the results of daily discharge simulation in the Arazkuseh subwatershed located in Gorganroud watershed, Golestan pro...

متن کامل

Three-stage inversion improvement for forest height estimation using dual-PolInSAR data

This paper addresses an algorithm for forest height estimation using single frequency single baseline dual polarization radar interferometry data. The proposed method is based on a physical two layer volume over ground model and is represented using polarimetric synthetic aperture radar interferometry (PolInSAR) technique. The presented algorithm provides the opportunity to take advantages of t...

متن کامل

Effect of digital elevation model’s resolution in producing flood hazard maps

Flooding is one of the most devastating natural disasters occurring annually in the Philippines. A call for a solution for this malady is very challenging as well as crucial to be addressed. Mapping flood hazard is an effective tool in determining the extent and depth of floods associated with hazard level in specified areas that need to be prioritized during flood occurrences. Precedent to the...

متن کامل

Underlying Topography Estimation over Forest Areas Using High-Resolution P-Band Single-Baseline PolInSAR Data

This paper discusses the potential and limitations of high-resolution P-band polarimetric synthetic aperture radar (SAR) interferometry (PolInSAR) in underlying topography estimation over forest areas. Time-frequency (TF) analysis in the azimuth direction is utilized to separate the ground scattering contribution from the total PolInSAR signal, without the use of any physical model, because the...

متن کامل

A New Approach for Fast Calculation of Sloped Terrace Earthwork Based on GIS in the Hilly Regions

Due to the undulating terrain, earthwork estimation was very difficult in the planning and design of land consolidation projects in the hilly areas. A new approach was proposed to estimate the earthwork of sloped terraces according to map features of planning and design of land consolidation in this paper. It was achieved by applying digital elevation model (DEM) theory and statistical function...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012