XIII SIMPÓSIO DE ESPECIALISTAS EM PLANEJAMENTO DA OPERAÇÃO E EXPANSÃO ELÉTRICA XIII SYMPOSIUM OF SPECIALISTS IN ELECTRIC OPERATIONAL AND EXPANSION PLANNING Collection System Cable Routing and Wake Losses Optimization in Offshore Wind Farms

نویسندگان

  • S. RODRIGUES
  • P. BAUER
  • P. A. N. BOSMAN
  • J. PIERIK
چکیده

Offshore wind farms with high installed capacities and located further from the shore are starting to be built by northern European countries. Furthermore, it is expected that by 2020, several dozens of large offshore wind farms will be built in the Baltic, Irish and North seas. These wind farms will be constituted of a considerable number of turbines packed together. Due to shadowing effects between turbines, the power production is reduced, resulting in a decreased wind farm efficiency. Moreover, the collection system length and complexity rapidly increase with the number of wind turbines installed, resulting in higher investment costs and power losses. Hence, when large wind farms are considered, wake losses and collection system total length are important aspects that need to be optimized. Nonetheless, designing a large offshore wind project is a very complex task. In the development phase, an enormous amount of time is used to generate feasible wind farm designs. For example, the manual layout optimization and cable routing are highly time consuming. Amongst others, this drawback leads to offshore wind projects with very high investments costs. In fact, electricity generated offshore is, up to today, substantially more expensive when compared to onshore wind or combined cycle gas turbines. Wind farm layout optimization is a possible solution to further increase the efficiency of wind projects leading to lower prices of energy generated offshore. Moreover, investment costs would be reduced if the collection system could be automatically designed via optimization tools. The aim of this work is to obtain optimized offshore wind farm layouts with enhanced energy production while considering the seabed constraints, e.g. maximum sea depth, inappropriate soil types and large seabed gradients. Through the use of optimization tools it is also desired to alleviate the designer teams of mundane manual layout optimization and cable routing. The optimized wind farm layout obtained presents higher energy yield. Although, the collection system total length is higher than for the standard case, the overall system efficiency is improved. Moreover, installation costs of the collection system were reduced through the avoidance of challenging areas of the wind farm. The wind turbine support structures costs were also reduced since deep areas of the seabed were avoided. In this work it is presented a novel optimization tool to obtain optimized offshore wind farm layouts while taking into consideration the seabed profile. Due to the increased offshore activity in recent years, as well as the expected installation in the coming years, this tool becomes very important and relevant for the offshore field.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Ix Simpósio De Especialistas Em Planejamento Da Operação E Expansão Elétrica Ix Symposium of Specialists in Electric Operational and Expansion Planning Synchronized Phasor Measurement System: Development and Applications

This paper describes the MedFasee project aiming at the development of a phasor measurement system (PMS) prototype and its applications for monitoring and control of power systems operation. A review of the state of the art, presented in the paper, provided the starting point for the project. A PMS simulator, developed to identify functionalities and specify system components, is presented. The...

متن کامل

XII SIMPÓSIO DE ESPECIALISTAS EM PLANEJAMENTO DA OPERAÇÃO E EXPANSÃO ELÉTRICA XII SYMPOSIUM OF SPECIALISTS IN ELECTRIC OPERATIONAL AND EXPANSION PLANNING Approach of Integrating Ancillary Services into a medium-term Hydro Optimization

This paper proposes a methodology to include the ability of offering secondary control in a seasonal medium-term self-scheduling of a price-taker hydro power producer with pumped storage. The methodology is based on a two-stage stochastic program. The first stage models the offering of secondary control and the second stage acts as recourse action by hourly generating power or use it for pumpin...

متن کامل

VII SIMPÓSIO DE ESPECIALISTAS EM PLANEJAMENTO DA OPERAÇÃO E EXPANSÃO ELÉTRICA VII SYMPOSIUM OF SPECIALISTS IN ELECTRIC OPERATIONAL AND EXPANSION PLANNING Capacity Payments and Supply Adequacy in Competitive Electricity Markets

1 This paper benefited from discussions with Dr. Ignacio PerezArriega of the Spanish Electricity Regulatory Commission who organized a workshop on the subject of capacity payment that motivated this work and from the presentations of Larry Ruff and Harry Singh at that workshop. The positions expressed in this paper,however, are the author's own views. 2 Department of IEOR, University of Califor...

متن کامل

XII SIMPÓSIO DE ESPECIALISTAS EM PLANEJAMENTO DA OPERAÇÃO E EXPANSÃO ELÉTRICA XII SYMPOSIUM OF SPECIALISTS IN ELECTRIC OPERATIONAL AND EXPANSION PLANNING “The Power Nodes Modeling Framework – Modeling and Assessing the Operational Flexibility of Hydro Power Units”

A novel concept for modeling power system units and processes including dispatchable and nondispatchable generators, controllable and non-controllable loads as well as different types of storage units is presented. Operational constraints that are relevant in power system operation such as power unit ratings, power ramp-rates, conversion efficiencies, and storage capacities can readily be inclu...

متن کامل

X Simpósio De Especialistas Em Planejamento Da Operação E Expansão Elétrica X Symposium of Specialists in Electric Operational and Expansion Planning

Load modelling is a perennial source of consternation. Postmortem analyses of disturbances frequently conclude that load models must be adjusted to achieve an adequate match between measured and simulated behaviour. However the development of load models that are accurate over a wide range of system conditions requires, 1) testing that is undesirable for customers, and/or 2) measurement of beha...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015