Construction of Fuzzy S

نویسنده

  • YASUHIRO ABE
چکیده

We construct a fuzzy S 4 , utilizing the fact that CP 3 is an S 2 bundle over S 4. We find that the fuzzy S 4 can be described by a block-diagonal form whose embedding square matrix represents a fuzzy CP 3. We discuss some pending issues on fuzzy S 4 , i.e., precise matrix-function correspondence, associativity of the algebra, and, etc. Similarly, we also obtain a fuzzy S 8 , using the fact that CP 7 is a CP 3 bundle over S 8 .

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A spatial decision support system for prioritizing 22 Districts of Tehran for construction of multiplex buildings

A multiplex is a kind of urban cultural facilities which not only has several different rooms for showing films, but also provides other services such as a wide range of food and drink stores and free/easy available parking. Multiplexes have significant cultural, economic and social characteristics. Given the importance and advantages of multiplexes, several multiplex buildings have been built ...

متن کامل

Hyperspace of a fuzzy quasi-uniform space

The aim of this paper is to present a fuzzy counterpart method of constructing the Hausdorff quasi-uniformity of a crisp quasi-uniformity. This process, based on previous works due to Morsi cite{Morsi94} and Georgescu cite{Georgescu08}, allows to extend probabilistic and Hutton $[0,1]$-quasi-uniformities on a set $X$ to its power set.  In this way, we obtain an endofunctor for each one of the c...

متن کامل

Fuzzy S and Its Construction

We present construction of fuzzy S, utilizing the fact that CP is an S bundle over S. Fuzzy S is obtained by imposing an additional algebraic constraint on fuzzy CP. Hence, as in the case of fuzzy CP = SU(4)/U(3), fuzzy S is globally defined on R with the additional constraint on top of the construction of fuzzy CP. We consider the commutative limit of fuzzy S and find that it naturally gives c...

متن کامل

Assessment Optimization of Safety and Health Risks Using Fuzzy TOPSIS Technique (Case Study: Construction Sites in the South of Iran)

Introduction: Safety and health risk assessment in industries is associated with uncertainties due to the variables affecting it. Therefore, in this research, optimizing safety and health risk assessment was investigated in construction sites by combining a multi-criteria decision-making technique (TOPSIS) and a fuzzy system. In the present study, to answer this question, a new method was used ...

متن کامل

Evaluating Construction Projects by a New Group Decision-Making Model Based on Intuitionistic Fuzzy Logic Concepts

Select an appropriate project is a main key for contractors to increase their profits. In practice, in this area the uncertainty and imprecise of the involved parameters is so high. Therefore, considering fuzzy sets theory to deal with uncertainly is more appreciate. The aim of this paper is present a multi-criteria group decision-making model under an intuitionistic fuzzy set environment. Henc...

متن کامل

Using Hybrid Fuzzy PROMETHEE II and Fuzzy Binary Goal Programming for Risk Ranking: A Case Study of Highway Construction Projects

Multi attribute decision making methods are considered as one of the most useful methods for solving ranking problems. In some decision making problems, while the alternatives for corresponding criteria are compared in a pairwise comparison manner, if the criteria are inherently fuzzy, debates will arise in ranking alternatives due to the closeness of the values of the criteria. In this researc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004