Improving Efficiency of an Automated Welding Shop: a Simulation Approach
نویسندگان
چکیده
This paper reports on the study of the "underbody front"-automated welding cell at Opel Belgium, a major automobile manufacturer of General Motors International Operations. It employs the use of simulation in an experimental design framework to identify potential improvements in average daily output through management of buffer sizes at key buffer locations within the cell. Many practical applications of animated computer simulation stop at the modelling and displaying of the process under study. Simulation as a tool for process reengineering or enhancement can only reach its full potential if incorporated in a comprehensive statistical study, involving enough replications of the simulation to attain statistically significant results. The paper will also report on the reactions of, and issues raised by, management when the experimental design methodology was presented as a tool for process enhancement and productivity improvement.
منابع مشابه
Improved Efficiency of an Automated Welding Shop: a Simulation Approach
This paper reports on the study of the "underbody front"-automated welding cell at Opel Belgium, a major automobile manufacturer of General Motors International Operations. It employs the use of simulation in an experimental design framework to identify potential improvements in average daily output through management of buffer sizes at key buffer locations within the cell. Many practical appli...
متن کاملErgonomics and simulation-based approach in improving facility layout
The use of the simulation-based technique in facility layout has been a choice in the industry due to its convenience and efficient generation of results. Nevertheless, the solutions generated are not capable of addressing delays due to worker’s health and safety which significantly impact overall operational efficiency. It is, therefore, critical to incorporate ergonomics in facility design. I...
متن کاملImproving for Drum_Buffer_Rope material flow management with attention to second bottlenecks and free goods in a job shop environment
Drum–Buffer–Rope is a theory of constraints production planning methodology that operates by developing a schedule for the system’s first bottleneck. The first bottleneck is the bottleneck with the highest utilization. In the theory of constraints, any job that is not processed at the first bottleneck is referred to as a free good. Free goods do not use capacity at the first bottleneck, so very...
متن کاملSimulation of a Two Cards JIT Production System
This paper presents a summary of the results from the simulation of a given two-stages production system which uses JIT. The system consists of an assembly line with two automated assembly cells and two assembly stock points and one manufacturing cell with three manufacturing stock points for storing reserved parts and one receiving stock. Carts with fixed capacity are used for handling the par...
متن کاملSimulation of a Two Cards JIT Production System
This paper presents a summary of the results from the simulation of a given two-stages production system which uses JIT. The system consists of an assembly line with two automated assembly cells and two assembly stock points and one manufacturing cell with three manufacturing stock points for storing reserved parts and one receiving stock. Carts with fixed capacity are used for handling the par...
متن کامل