Production–inventory scheduling using Ant System metaheuristic
نویسندگان
چکیده
The present paper presents the algorithmic solution, based on an Ant System metaheuristic, of an industrial production–inventory problem in a steel continuous-casting plant. The model proposed is based on an objective function, the aim of which is to find the most profitable production schedule of the steel billets. Furthermore, the model takes into account the relevant parameters of the finite-capacity productive system (e.g. set-up and processing times, demand profile, warehouse capacity). Moreover, the make-to-order production environment of the company presents a significant manufacturing phase, which is represented by the billet cooling warehouse (similarly to the drying process in paper and textile production, or maturing in food production): this fact introduces a relevant constraint to production schedule. The study shows the basic criteria used for the problem modelling and the steps proposed for profit optimisation. The Ant System algorithm implemented is discussed and its relevance for the steel plant production management is shown. r 2005 Elsevier B.V. All rights reserved.
منابع مشابه
An Ant Colony System Metaheuristic Algorithm for Solving a Bi-Objective Purchasing Scheduling Problem
In this work the Purchasing Scheduling Problem (PSP) is presented, based in study cases of public and private sectors. PSP models the purchasing process in both scenarios through an optimization approach. It is based on the multi-objective formulation of the knapsack problem. Therefore, PSP is defined as a based-graph problem with two objectives: maximization of satisfied demands and minimizati...
متن کاملAnt Colony Optimization for Job Shop Scheduling Problem
This paper presents an application of the Ant colony optimization metaheuristic to the job shop scheduling problem. A pheromone alteration strategy which improves the basic ant system by utilizing the behaviour of artificial ants to perform local search is introduced. Experiments using well-known benchmark JSSP problems show that this approach improves on the performance obtained by the basic a...
متن کاملA Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)
Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...
متن کاملMulti-objective Scheduling onto Heterogeneous Processors System Using Ant System & Fuzzy Logic Controller
In recent years, the static and the dynamic jobs scheduling onto heterogeneous processors present a very well studied problem. Typically the Data Grid Scheduling problem (DGS) has recently become an active research area. The heterogeneous processors scheduling problem (HPSP) can be formulated in several ways and the efficient scheduling of the HPSP on the available resources is one of the key f...
متن کاملResource Optimization in Job-shop Scheduling using Ant-Colony-Optimization Metaheuristic
Present study elucidates the probity of ant colony optimization metaheuristic in minimizing the makespan by efficiently allocating jobs to workstations in general aviation maintenance. The metaheuristic technique is applied to real workplace problems in general aviation sector of Pakistan to resolve scheduling quandaries of XT-10 helicopters inspection in Burq Air Services (Pseudo names of orga...
متن کامل