A BIM-based approach for automated tower crane layout planning

نویسندگان

  • Jun Wang
  • Xuedong Zhang
  • Wenchi Shou
  • Xiangyu Wang
  • Bo Xu
  • Jeong Kim
  • Peng Wu
چکیده

a Australasia Joint Research Centre for Building Information Modelling, Curtin University, Australia b School of Management Science and Engineering, Anhui University of Finance & Economics, China c Department of Housing and Interior Design, Kyung Hee University, Seoul, South Korea d School of Construction Management and Real Estate, Chongqing University, China e School of Engineering and Technology, Central Queensland University, Australia

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Trajectory Planning for a Welding Robot Based on the Bezier Curve

According to the requirements for tower crane welding robots, precisely planning the welding trajectory is essential. The optimal model for the least-time trajectory planning for the robot is established by Bezier curve, which has the characteristic of sub-section processing. With the consideration of constraints such as joint angular velocity and acceleration, the specific operation steps of g...

متن کامل

TOWER CRANES AND SUPPLY POINTS LOCATING PROBLEM USING CBO, ECBO, AND VPS

Tower cranes are major and expensive equipment that are extensively used at building construction projects and harbors for lifting heavy objects to demand points. The tower crane locating problem to position a tower crane and supply points in a building construction site for supplying all requests in minimum time, has been raised from more than twenty years ago. This problem has already been so...

متن کامل

A Framework for Crane Selection in Large-scale Industrial Construction Projects

Selecting the best possible cranes and identifying spatial conflict-free locations on sites can result in productivity and safety improvements for large-scale industrial construction projects. In the current practice, experienced lift engineers select cranes based on the heaviest lift and/or the largest lifting radius of the identified crane. This practice is relatively time-consuming, and opti...

متن کامل

A BIM-based automated site layout planning framework for congested construction sites

a r t i c l e i n f o Keywords: Actual travel paths Building information modelling (BIM) Construction site layout planning (CSLP) Congested sites Facility dimensions optimization Interior storage Site layout planning is often performed on construction sites to find the best arrangement of temporary facilities so that transportation distances of on-site personnel and equipment are minimized. It ...

متن کامل

Identification and assessment of human errors among tower crane operators using SHERPA and CREAM techniques

Introduction: Cranes are of the major causes of accidents in the construction industries. As human error mostly causes crane accidents, this study aims to investigate the human errors of tower crane operators in the construction projects using SHERPA and CREAM techniques. Material and Method: In this research, first, all of the tasks of the tower crane operator were identified and analyzed. Th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016