The construction of the Wendelstein 7-X stellarator

نویسنده

  • T. Klinger
چکیده

The construction status of the large superconducting stellarator Wendelstein 7-X is reported. The manufacturing and tests of the main components are reviewed and major design tasks during the device assembly phase are summarized. The assembly is currently proceeding on three out of five assembly stands. Four out of ten magnet half-modules are completed. Major work packages are the electric and cryogenic connection of magnets, support ring and thermal shield. Other main tasks are the thermal insulation, the port assembly and the manufacturing and assembly of the actively cooled in-vessel components. The construction work is well on track and the assembly will be completed in mid 2014 as planned. A staged approach to steadystate operation with 10MW heating power is presented, where the key element is an inertially cooled testdivertor unit for the development of high-power steady-state scenarios. It is replaced after a first short-pulse operation phase by the actively cooled divertor.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Bayesian experimental design of a multichannel interferometer for Wendelstein 7-X.

Bayesian experimental design (BED) is a framework for the optimization of diagnostics basing on probability theory. In this work it is applied to the design of a multichannel interferometer at the Wendelstein 7-X stellarator experiment. BED offers the possibility to compare diverse designs quantitatively, which will be shown for beam-line designs resulting from different plasma configurations. ...

متن کامل

Diagnostics development for quasi-steady-state operation of the Wendelstein 7-X stellarator (invited).

The critical issues in the development of diagnostics, which need to work robust and reliable under quasi-steady state conditions for the discharge durations of 30 min and which cannot be maintained throughout the one week duration of each operation phase of the Wendelstein 7-X stellarator, are being discussed.

متن کامل

Summary of R&D Activities for the Production of the Divertor Target Elements of Wendelstein 7-X

The realization of the high heat flux divertor of the stellarator Wendelstein 7-X requires the production of 890 target elements. Since the divertor has to operate for 30 minutes with an input cw plasma power of 10 MW, the target elements need to be actively water-cooled. A target element is made of a CuCrZr copper alloy heat sink armored with CFC NB31 tiles. It is designed to remove a stationa...

متن کامل

Spatial distribution of turbulence in the Wendelstein 7-AS stellarator

In this paper measurements of short wavelength electron density fluctuations using collective scattering of infrared light are presented. The Wendelstein 7-AS (W7-AS) stellarator (Renner H et al 1989 Plasma Phys. Control. Fusion 31 1579) and the diagnostic are briefly described. A series of plasma discharges with reproducible confinement transitions was created by ramping up the plasma current....

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008