Novel simulation-based algorithms for optimal open-loop and closed-loop scheduling of deficit irrigation systems
نویسندگان
چکیده
The scarcity of water compared with the abundance of land constitutes the main drawback within agricultural production. Besides the improvement of irrigation techniques a task of primary importance is solving the problem of intra-seasonal irrigation scheduling under limited seasonal water supply. An efficient scheduling algorithm has to take into account the crops’ response to water stress at different stages throughout the growing season. Furthermore, for large-scale planning tools compact presentations of the relationship between irrigation practices and grain yield, such as crop water production functions, are often used which also rely on an optimal scheduling of the considered irrigation systems. In this study, two new optimization algorithms for single-crop intraseasonal scheduling of deficit irrigation systems are introduced which are able to operate with general crop growth simulation models. First, a tailored evolutionary optimization technique (EA) searches for optimal schedules over a whole growing season within an open-loop optimization framework. Second, a neuro-dynamic programming technique (NDP) is used for determining optimal irrigation policy. In this paper, different management schemes are considered and crop-yield functions generated with both the EA and the NDP optimization algorithms compared. doi: 10.2166/hydro.2011.073 N. Schütze (corresponding author) Institute of Hydrology and Meteorology, Dresden University of Technology, D-01062 Dresden, Germany E-mail: [email protected] M. de Paly Wilhelm-Schickard-Institute for Computer Science, University of Tübingen, Sand 1, D-72076 Tübingen, Germany U. Shamir Technion–Israel Institute of Technology, Haifa 32000, Israel
منابع مشابه
Control of Flexible Link Robot using a Closed Loop Input-Shaping Approach
This paper is has addressed the Single Flexible Link Robot. The dynamical model is derived using Euler-Lagrange equation and then a proper controller is designed to suppress a vibration based-on Input-Shaping (IS) method. But, IS control method is an open loop strategy. Due to the weakness of open loop control systems, a closed loop IS control system is proposed. The achieved closed loop c...
متن کاملDesigning a Stochastic Multi-Product Closed Loop Supply Chain Network Considering the Discount and Solving Using the Firefly Algorithm with Decoding Based on Priority
The closed loop supply chain is becoming one of the industry's most important areas of business, due to environmental and business factors. Planning and implementing a closed loop supply chain network provide more profit, customer satisfaction, and a good social image to the company. While most supply chain networks are not equipped with back-up channels, this paper presents a mixed integer non...
متن کاملDynamic Load Carrying Capacity of Mobile-Base Flexible-Link Manipulators: Feedback Linearization Control Approach
This paper focuses on the effects of closed- control on the calculation of the dynamic load carrying capacity (DLCC) for mobile-base flexible-link manipulators. In previously proposed methods in the literature of DLCC calculation in flexible robots, an open-loop control scheme is assumed, whereas in reality, robot control is achieved via closed loop approaches which could render the calculated ...
متن کاملA New Near Optimal High Gain Controller For The Non-Minimum Phase Affine Nonlinear Systems
In this paper, a new analytical method to find a near-optimal high gain controller for the non-minimum phase affine nonlinear systems is introduced. This controller is derived based on the closed form solution of the Hamilton-Jacobi-Bellman (HJB) equation associated with the cheap control problem. This methodology employs an algebraic equation with parametric coefficients for the systems with s...
متن کاملFeedback Control for Real - time Scheduling ’
Most of real-time scheduling algorithms are open-loop algorithms as the scheduling decisions are based on the worst-case estimates of task parameters. They do not continuously observe the performance of the system and do not dynamically adjust the system parameters t o improve performance. In many cases, it is preferable to base scheduling decisions on average-case workload parameters and be re...
متن کامل