Multilayer Traffic Engineering Experimental Demonstrator in the Nobel-II Project
نویسندگان
چکیده
The present paper aims at presenting the specification, implementation and preliminary testing of a basic MultiLayer Traffic Engineering (MLTE) experiment within the framework of European Project IST NOBEL-II. The main goal of this experimental activity is the validation of a very simple MLTE concept scenario. The main output would be the TE Manager software and additional Interfacing Tools as key components for future MLTE experimentation. The experimentation is proposed by interconnecting multiple research networks of different technologies following an ASON/GMPLS architecture, which allows the dynamic establishment of on-demand optical circuits based on the UNI interface.
منابع مشابه
Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...
متن کاملAn electronic co - pilot : the Pro - Lab II
|This paper presents the global architecture of the Pro-Lab II demonstrator whose purpose is to develop an electronic co-pilot in order to assist the human driver. It will integrate the works of the diierent French participants to the Pro-Art project. The Pro-Lab II demonstrator has been structured into ve main functions. This paper will focus on thèco-pilot' function which is jointly developed...
متن کاملA Bi-objective Pre-emption Multi-mode Resource Constrained Project Scheduling Problem with due Dates in the Activities
In this paper, a novel mathematical model for a preemption multi-mode multi-objective resource-constrained project scheduling problem with distinct due dates and positive and negative cash flows is presented. Although optimization of bi-objective problems with due dates is an essential feature of real projects, little effort has been made in studying the P-MMRCPSP while due dates are included i...
متن کاملA multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملEnergy Savings with Multilayer Traffic Engineering in Future Core Networks
The main advantage of multilayer automatically switched IP-over-MPLSover-optical networks is their ability and their flexibility to adapt to the variations of the offered traffic. Multilayer traffic engineering mechanisms exploit this characteristic and perform traditional rerouting enriched with online IP logical topology reconfiguration. These mechanisms aim at optimizing resource usage and m...
متن کامل