Material Flow Map and Layout Optimization: action plan and software validation

نویسندگان

  • Domenico Falcone
  • Alessandro Silvestri
  • Vincenzo Duraccio
  • Gianpaolo Di Bona
چکیده

During the “life” of an industrial plant, many changes happen. Starting from an initial configuration of production lines, manufacturing and assembly departments, tools and equipment rooms, the plant layout could change because of new and different needs. Often, the above layout modifications are not correctly studied and optimized, causing problems in the management of worker movement and material flow. The main configurations of a firm, closely linked to the production quantity of each component, are: “product” or “process” layouts. In the case of a product layout, we arrange activities in a line according to the sequence of operations for a particular product or service; instead in the case of a process layout, similar activities are grouped together in departments according to the process or function they perform. The “product” configuration (commonly called “flow-shop”) is generally more automated and efficient; while in the other side, the “process” configuration (commonly called “job-shop”) is more flexible and manual. The present work suggests the main steps to verify the layout of an industrial plant organized in departments (“process” layout), in order to improve material flow, reducing production lead time, warehouse and workplace. The work suggests the adoption of different tools, such as: paths chart, product-quantity data sheet, flow process chart, from-to analysis, relationship chart of service and production activities, etc. In particular, we have applied the above tools to a company working in the field of electro-mechanical components. First of all, it is necessary to study the current layout, manufacturing, storage and service areas. Subsequently we need to map the material flow, starting from products information, such as: bill of materials; manufacturing cycles; ordering data. By matching layout and product information, many criticalities are pointed out. The material flow can be visualized on the plant plan, by using right codifications (measurement units and standard symbols). It is possible to value quantities and distances. Thanks to the mapping phase, it is possible to recognize the value stream and consequently the non-value activities. After the construction of the material flow map, it is necessary to draw the relationship chart. In fact, to improve the current layout, not only considerations about materials are required, but also different ones. We need information about exchange of documents rather than equipment and tools between departments. At this point, in order to adopt the right actions, it is important to define our goals: flow linearization, distance and material exchange reduction, workplace and warehouse areas saving, etc. For each goal, we can define a particular index to value the effectiveness of our choices; however it is impossible to find an unique solution able to improve all the defined indexes at the same time. Therefore, the work proposes new approach and criteria able to combine different indexes and goals. Finally, it is interesting to validate the taken choices trough customized or commercial software. In particular we have used the improvement algorithm CRAFT (Computerized Relative Allocation of Facilities Technique), based on the minimization of the transportation cost. It is more widely used than ALDEP and CORELAP, that consider relationships between departments more important. Thanks to that commercial optimizer software, it is possible to verify the goodness of the layout modifications proposed. The present work formalizes an approach for mapping material flow and optimizing plant layout, through the integration of several instruments, less or more complex, and the definition of combined indexes and criteria.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A simulated annealing algorithm to determine a group layout and production plan in a dynamic cellular manufacturing system

In this paper, a mixed-integer linearized programming (MINLP) model is presented to design a group layout (GL) of a cellular manufacturing system (CMS) in a dynamic environment with considering production planning (PP) decisions. This model incorporates with an extensive coverage of important manufacturing features used in the design of CMSs. There are also some features that make the presented...

متن کامل

Mathematical Programming Models for Solving Unequal-Sized Facilities Layout Problems - a Generic Search Method

 This paper present unequal-sized facilities layout solutions generated by a genetic search program named LADEGA (Layout Design using a Genetic Algorithm). The generalized quadratic assignment problem requiring pre-determined distance and material flow matrices as the input data and the continuous plane model employing a dynamic distance measure and a material flow matrix are discussed. Computa...

متن کامل

Integrative Cell Formation and Layout Design in Cellular Manufacturing Systems

This paper proposes a new integrative view of manufacturing cell formation and both inter-cell and intra-cell layout problems. Cells formation and their popular bi-directional linear layout are determined simultaneously through a Dynamic Programming algorithm (with the objective of minimizing the inter-cell flow cost under a cell size constraint). This Dynamic Programming algorithm is implement...

متن کامل

Developing Plan of action and strategic map for "Nursing Sciences development": an experience

Developing Plan of action and strategic map for "Nursing Sciences development": an experience

متن کامل

Performance Enhancement in a Print Pack Firm by Layout Optimization

this paper presents the application of simulation software Arena and layout optimization software Plan Opt to a dynamic print and packaging company in India, Coimbatore. Some of the problems expressed by the company were large and unnecessary volume of shop floor material handling cost, difficulties and confusion over production planning, long products lead times resulting in losing customers a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011