Key OR design, construction changes proposed.
نویسنده
چکیده
منابع مشابه
Change Management and Change Process Model for the Iranian Construction Industry
Changes are inevitable in construction projects. They could lead to disruptive impacts on the quality, schedule and budget of projects. Identifying changes and anticipating their consequences can help project teams mitigate these negative impacts. As a result, a change process model has been defined to improve this procedure. At first the present paper the defines some of the key terms in this ...
متن کاملDesign Optimization and Construction of Double-Sided Linear Induction Motor
Linear induction motors have single and double-sided structures which are used in special applications, according to their advantages and disadvantages. Due to advantages such as lack of normal forces in double-sided type, these motors are more controllable and popular than the single-sided type, especially for transportation applications. In literature, single-sided linear induction motors ha...
متن کاملGuide for the Design and Construction of Concrete Reinforced with FRP Bars (ACI 440.1R-03)
This paper reports on the key features of the “Guide for the Design and Construction of Concrete Reinforced with FRP Bars” issued by the American Concrete Institute (ACI). For new construction, FRP bars have been used as the internal reinforcement in concrete members to replace conventional steel rebars for a host of reasons. The principles for design and construction were first established and...
متن کاملA mathematical model for sustainable probabilistic network design problem with construction scheduling considering social and environmental issues
Recent facility location allocation problems are engaged with social, environmental and many other aspects, besides cost objectives.Obtaining a sustainable solution for such problems requires development of new mathematical modeling and optimization algorithms. In this paper, an uncapacitated dynamic facility location-network design problem with random budget constraints is considered. Social i...
متن کاملOPTIMAL PERFORMANCE-BASED SEISMIC DESIGN OF COMPOSITE BUILDING FRAMES WITH RC COLUMNS AND STEEL BEAMS
Composite RCS building frames integrate reinforced concrete columns with structural steel beams to provide an efficient solution for the design and construction of earthquake-resisting structures. In this paper, an optimization framework is developed for performance-based seismic design of planar RCS moment resisting frames. The objective functions are defined as minimizing the construction cos...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- OR manager
دوره 28 8 شماره
صفحات -
تاریخ انتشار 2012