Difficulties in Post-tsunami Reconstruction Plan following Japan’s 3.11 Mega Disaster:dilemma between Protection and Sustainability

نویسنده

  • Katsuya HIRANO
چکیده

After the 11 March 2011 tsunami, post-tsunami reconstruction planning has started. In this article several key points and difficulties in the reconstruction plan are introduced based on the experiences of the author, who is part of the planning process. Before explaining the problems with the reconstruction plan, comprehensive planning problems in rural areas are introduced. These problems are population decline, a super-aging society, decline of city/town centre and land problems. Next, the goal of post-tsunami reconstruction is argued through the key concept of “building back better” to confirm the purpose of the reconstruction. Finally, based on the tsunami protection level and its background thought, a number of dilemmas are discussed. For example, the result of the reconstruction project of “moving to higher ground” means a separated city/town/village, yet a compact city/town/village concept is required in the population decline phase.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Learning From Past; Assessment of the Post-War Reconstruction of Qasr-e-Shirin in Iran

This paper addresses the post-war reconstruction experience of Qasr-e-Shirin, Iran, in the aftermath of the Iran-Iraq war (1980-1988). Compared with the war-damaged cities in southwest Iran, western cities such as Qasr-e-Shirin lack a post-war reconstruction assessment and documentation. With an objective view, the author aims at documenting the situation of the city almost thirty years after i...

متن کامل

Patient Race and Provider Predict Patient Satisfaction Following Post-Mastectomy Breast Reconstruction

BACKGROUND Post-mastectomy breast reconstruction is commonly performed in the United States with numerous options available to patients and providers. This study evaluated patient race and provider in prediction of patient satisfaction following post-mastectomy breast reconstruction. METHODS The patient satisfaction for women who underwent post mastectomy breast reconstruction at U...

متن کامل

Education, Vulnerability, and Resilience after a Natural Disaster.

The extent to which education provides protection in the face of a large-scale natural disaster is investigated. Using longitudinal population-representative survey data collected in two provinces on the island of Sumatra, Indonesia, before and after the 2004 Indian Ocean tsunami, we examine changes in a broad array of indicators of well-being of adults. Focusing on adults who were living, befo...

متن کامل

Urban Sustainability Versus Green-Washing—Fallacy and Reality of Urban Regeneration in Downtown Seoul

This paper examines the planning paradigm shift related to the contested “urban renaissance” mega-project in Downtown Seoul (Korea). Similar to other global cities, over the last few decades, different mega-projects have been successfully implemented in Seoul. These projects have been considered engines for urban renewals and transformation. This paper builds on the analysis of the failure and ...

متن کامل

Japan After March 11th 2011: Between Swift Reconstruction and Sustainable Restructuring

Over five years after the “triple disaster” of an earthquake, a tsunami, and the subsequent nuclear accident at the Fukushima Daiichi power plant that devastated Japan’s Tohoku region on March 11th, 2011, reconstruction is still progressing slowly. The difficulties are unprecedented and vast in scope: over 400 communities in 62 municipalities are affected in six different prefectures, along hun...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012