Preemptive Scheduling with Variable Profile, Precedence Constraints and Due Dates
نویسندگان
چکیده
This paper is concerned with the problem of scheduling preemptive tasks subject to precedence constraints in order to minimize the maximum lateness and the makespan. The number of available parallel processors is allowed to vary in time. It is shown that when an Earliest Due Date rst algorithm provides an optimal nonpreemptive schedule for unit-execution-time (UET) tasks, then the preemptive priority scheduling algorithm, referred to as Smallest Laxity First, provides an optimal preemptive schedule for real-execution-time (RET) tasks. When the objective is to minimize the makespan, we get the same kind of result between Highest Level First schedules solving nonpreemptive tasks with UET and the Longest Remaining Path rst schedule for the corresponding preemptive scheduling problem with RET tasks. These results are applied to four speciic proole scheduling problems and new optimality results are obtained.
منابع مشابه
The preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach
Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...
متن کاملMulti-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملSINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملScheduling Unit-time Operation Jobs on Identical Parallel Machines and in a Flow Shop: Complexity and Correlation
This paper considers the complexity and the correlation of scheduling unit-time jobs on identical parallel machines and unit-time ow-shop scheduling under precedence constraints. It is shown that, in the case of chain-like precedence constraints, the nonpre-emptive parallel-machines problem and the ow-shop problem to minimize maximum or total completion time can be solved in polynomial time, an...
متن کاملSingle Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs
This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Discrete Applied Mathematics
دوره 58 شماره
صفحات -
تاریخ انتشار 1995