MRP-3 concurrent integration of planning and scheduling in OKP (one of a kind production)

نویسنده

  • Javier Borda Elejabarrieta
چکیده

The current market practices for most capital equipment manufacturers provide them with some special difficulties in production management tasks. These are, mainly: 1. Design changes during the necessary overlapping of the production process. 2. Some degree of uncertainty with supplier's due dates and quality specifications accomplishments. 3. Sensibility of changes and other incidences in the current schedules that operates at the shop floor level. 4. Warnings of a chaotic behaviour in both due-dates and productivity originated by a delay between the coupling of the rescheduling of operations at the shop-floor level and the planning process at the office level. Advanced technology for facilitating integration, lay the concept of the MRP-3, a new production management system specially indicated for the "minibusiness" model of a factory, and which is probably going to give a leap in the next future to the organisational procedures in discrete manufacturing, and in particular in OKP. 1. OBJECTIVES Regarding all that issues, the objectives of the paper are: 1. To establish a reference-model for the utilisation of the MRP-3 system for one to twelve months of lead-time (intermediate lead-times) OKP facility. 2. To make a functional design approach of the MRP-3 in OKP. The reference model is used as an organizational issue leading the way in wich a particular OKP company must interact with the MRP-3 software. Key issues for that are:-The planning integration as a part of the Engineering department.-The "coordination technology" engineer who is going to set and facilitate information structure along the project.-Prompt definitions of the FAS (final-assembly-schedule) and BOP (bill of processes), with assignation of critical materials to each BOP's gantt bar. 2. INTRODUCTION MRP has been largely used in OKP eventually in conjunction with the PERT-CPM. When done, a common practice is performing the first order BOM calculation based on the critical path nodes of the PERT, and the second order BOM is coupled using due date tolerances around the first order calculated ones.This is mostly a tuned and relatively advanced practice, requiring one way (from PERT to MRP) software integration. But the inconvenients are the following ones:. The PERT (or GANTT-BAR correspondent deployment) is lost as a major way of communication along the company due to the breaking from "phases" into "bills of materials". The phases planning is the most natural way of communication at the shop floor level and with the planning-engineering department.. Plant capacity scheduling and rescheduling are not …

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Study and Prospects: Adaptive Planning and Control of Supply Chain in One-of-a-kind Production

Based on the research project titled “AdaptivePlanningandControlofSupplyChaininOne-of-a-kind Production”, the research group performed a systematicreview ofsupply chain integration, riskprediction and control and traceability. Studies of a computer-aided and integrated production system for cost-effective OKP systemare included. Our efforts relevant to integration of supply chain in OKP, modeli...

متن کامل

A Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)

Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...

متن کامل

One-of-a-Kind Production (OKP) Planning and Control: An Empirical Framework for the Special Purpose Machines Industry

In this paper, we focus on the One-of-a-Kind Production (OKP) industry, where each product is designed and manufactured based on specific customer requirements to a large extent, according to an Engineer To Order (ETO) approach. The paper illustrates an empirical study on the state-of-the-art of information systems supporting the leading processes in OKP companies. Through a set of 21 case stud...

متن کامل

یکپارچه سازی برنامه‌ریزی و زمانبندی تولید در صنایع فرآیندی چند محصولی با سیستم تولیدی پیوسته

  One of the main elements of each supply chain is production. Production planning in multi-products process industries in which products are subjected to the complicated operational constraints is a very hard work because production of computed optimal volume should be compatible with operation scheduling constraints of production system. Thus, integration idea has been proposed for required d...

متن کامل

An improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling

Integration of production planning and scheduling is a class of problems commonly found in manufacturing industry. This class of problems associated with precedence constraint has been previously modeled and optimized by the authors, in which, it requires a multidimensional optimization at the same time: what to make, how many to make, where to make and the order to make. It is a combinatorial,...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1996