Investment timing and optimal capacity choice for small hydropower projects

نویسندگان

  • Thor Bøckman
  • Stein-Erik Fleten
  • Erik Juliussen
  • Håvard J. Langhammer
  • Ingemar Revdal
چکیده

This paper presents a method for assessing small hydropower projects that are subject to uncertain electricity prices. We present a real options-based method with continuous scaling, and we find that there is a unique price limit for initiating the project. If the current electricity price is below this limit it is never optimal to invest, but above this limit investment is made according to the function for optimal size. The connection between the real option and the physical properties of a small hydropower plant is dealt with using a spreadsheet model that performs a technical simulation of the production in a plant, based on all the important choices for such a plant. The main results of the spreadsheet are simulated production size and the investment costs, which are in turn used for finding the value of the real option and the price limit. The method is illustrated on three different Norwegian small hydropower projects.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Investment Timing and Capacity Choice for Small-Scale Wind Power Under Uncertainty

This paper presents a method for evaluation of investments in small-scale wind power under uncertainty. It is assumed that the price of electricity is uncertain and that an owner of a property with wind resources has a deferrable opportunity to invest in one wind power turbine within a capacity range. The model evaluates investment in a set of projects with different capacity. It is assumed tha...

متن کامل

Optimal Sizing of Low Head Hydropower Plant- A Case Study of Hydropower Project at Head of UCC (Lower) at Bambanwala

Pakistan is facing serious shortfall of electricity for few decades. Small hydropower projects can alleviate the worsening situation. The sizing of a low head hydropower plant plays a vital role in establishing the feasibility of the project. The plant needs to be optimized for energy produced, efficiencies of the plant components, number of units and its financial/economic parameters. This pap...

متن کامل

Uncertain climate policy decisions and investment timing: Evidence from small hydropower plants

Based on panel data of 214 licenses to construct small hydropower plants, we examine whether uncertainty with respect to the introduction of a market for renewable energy certificates affected the timing of investments in Norway from 2001 to 2010. Using regression analysis, we find that (1) investors owning a portfolio of licenses acted in accordance with a real options investment rule, and unc...

متن کامل

Investment and capacity choice under uncertain demand

Papers published in this report series are preliminary versions of journal articles and not for quotations. Abstract This paper extends the real options literature by discussing an investment problem, where a firm has to determine optimal investment timing and optimal capacity choice at the same time under conditions of irreversible investment expenditures and uncertainty in future demand. Afte...

متن کامل

Investment, Capacity Choice and Outsourcing under Uncertainty

In this paper, we formulate a firm’s investment in a production facility with maximum capacity and outsourcing strategy. Existing literature of capacity choice results in an explosive capacity and long delay in investment. Actually, there are slight possibility that a firm installs a facility with an explosive capacity, instead, a firm can outsource production when the demand exceeds its capaci...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 190  شماره 

صفحات  -

تاریخ انتشار 2008