Due-Date Based Scheduling and Control Policies in a Multiproduct Semiconductor Wafer Fabrication Facility
نویسندگان
چکیده
This paper focuses on lot release control and scheduling problems in a semiconductor wafer fab producing multiple products that have different due dates and different process flows. For lot release control, it is necessary to determine the type of a wafer lot and the time to release wafers into the wafer fab, while it is necessary to determine sequences of processing waiting lots in front of workstations for lot scheduling. New dispatching rules are developed for lot release control and scheduling considering special features of the wafer fabrication process. Simulation experiments are carried out to test the dispatching rules. Results show that lot release control and lot scheduling at photolithography workstations are more important than scheduling at other workstations. Also, it is shown that new dispatching rules work better in terms of tardiness of orders than existing rules such as the EDD (earliest due date) rule and other wellknown dispatching rules for multimachine scheduling.
منابع مشابه
Simplification Methods for Accelerating Simulation-Based Real-Time Scheduling in a Semiconductor Wafer Fabrication Facility
This paper presents a real-time scheduling methodology in a semiconductor wafer fab that produces multiple product types with different due dates. In the suggested real-time scheduling method, lot scheduling rules and batch scheduling rules are selected from sets of candidate rules based on information obtained from discrete event simulation. Since a rule combination that gives the best perform...
متن کاملModeling, Scheduling, and Prediction in Wafer Fabrication Systems Using Queueing Petri Net and Genetic Algorithm
-Wafer fabrication is one of the most competitive manufacturing business in the world. In order to survive from such strongly competitive environment, finding an effective schedule which can result in higher machine utilization and throughput rate, shorter cycle time, and lower WIP (Work-In-Product) inventory becomes a major task. Besides that, in order to help customers to make ordering decisi...
متن کاملArticleThe optimal decision combination in semiconductor manufacturingSungwook Yoon
Wafer fabrication is a capital-intensive and highly complex manufacturing process. In a wafer fabrication facility (fab), wafers are grouped as a lot to go through repeated sequences of operations to build circuitry. Lot scheduling is an important task for manufacturers in order to improve production efficiency and satisfy customers’ demands of on-time delivery. Cycle time and average work-in-p...
متن کاملThe Optimal Decision Combination in Semiconductor Manufacturing
Wafer fabrication is a capital-intensive and highly complex manufacturing process. In a wafer fabrication facility (fab), wafers are grouped as a lot to go through repeated sequences of operations to build circuitry. Lot scheduling is an important task for manufacturers in order to improve production efficiency and satisfy customers’ demands of on-time delivery. Cycle time and average work-in-p...
متن کاملRule-based scheduling in wafer fabrication with due date-based objectives
Wafer fabrication is a capital-intensive and highly complex manufacturing process. In the wafer fabrication facility (fab), wafers are grouped as a lot to go through repeated sequences of operations to build circuitry. Lot scheduling is an important task for manufacturers to improve production efficiency and meet customers’ requirements of on-time delivery. In this research we propose a dispatc...
متن کامل