Apz-earth: a Simulation Based System for the Estimating And) Planning of Earth Moving Operations
نویسندگان
چکیده
Simulation studies are well suited for the analysis of earth moving operations for many reasons. First, projects generally involve some form of resource interactions where certain equipment must obtain certain resources before proceeding. Second, task durations are highly empirical and are thus suited for stochastic modeling. And third, projects are affected by external processes such as breakdowns and external traffic. Simulation can take all of those elements into account and help estimators gain greater insight into the interactions and productions of earth moving projects. This papers overviews and discusses the features AP2Earth, a computer tool for the simulation, analysis and estimation of large earth moving projects. Data for the model can be imported from an equipment management module and exported to a reporting or estimating module. AP2-Earth allows users to experiment with a number of variables such as the equipment combinations or the road layouts and examine the effect on production.
منابع مشابه
Dynamic planning of earthmoving projects using sys- tem dynamics
Purpose The purpose of this paper is to present a dynamic planning model for earth moving operations through capturing the operations context level (scope change, skill level, etc.). Method Uncertainties, scope, and changes in project condition call for dynamic modeling of earthmoving operations. Static planning and scheduling methods such as CPM and PERT neglect – and are incapable of – consid...
متن کاملA multi-lined behavior simulation approach for liquefaction of earth-dam
A few of the presented soil behavior models are capable of predicting the triggering and post liquefaction and also shear band mechanism through the soil media. The assessment of earth-dam body behavior as a soil structure made of cohesive soil in core and non-cohesive soil as the core supports, including water interaction at upstream through earthquake upon a multi-line constitutive equations ...
متن کاملBreak fill-dam simulation using GeoStudio (case study: Safarood earth dam, Kerman)
One of the main reason of earth-dam breaks is inner erosion which is caused by washing fine soil particles and finally lead to seepage inside the dam. Seepage will decrease effective tension in the earth-dam's core and arching phenomena is occurred. More settlement of core than to shell is the consequence of arching and occurrence of cracking. In this paper, GeoStudio software based on finite e...
متن کاملEstimating an appropriate plastic concrete mixing design for cutoff walls to control leakage under the earth dam.
Making use of concrete materials in cut-off walls, because of their low permeability and standing high Hydraulic Gradient caused by underground drainage, has attracted great amount of attention. Using ordinary concrete with high elasticity modulus, compared to other materials may accompany with problems including brittleness of cutoffs due to dynamic stresses. To solve this problem, adding a ce...
متن کاملEstimation of soil erosion using SLEMSA model and OWA approach in Lorestan Province (Iran)
Identifying suitable models for estimating soil erosion is one of the most importantissues facing decision makers and managers in comprehensive planning and management ofsoil and water. In this research, with the purpose of estimating soil erosion in LorestanProvince, the conventional SLEMSA method was jointly used with OWA (orderedweighted avera...
متن کامل