Activity Driven Budgeting of Software Projects
نویسندگان
چکیده
There are numerous forecast models of software development costs, however, various problems become apparent in context to practical application. Standardized methods, such as COCOMO II have to be calibrated at an individual operational level on the basis of the underlying database. This paper presents a new activity based approach that is based on business specific cost data that can be easily integrated into existing management accounting systems. This approach can be applied to software development projects based on the unified process in which activity driven budgeting promises several advantages compared to common tools in use. It supports enterprise specific cost forecasting and control and can be easily linked with risk analysis. In addition to the presentation of a conceptual design model, the authors present a framework for activity driven budgeting and cost management of software development projects combined with concrete implementation examples.
منابع مشابه
A Model-Driven Decision Support System for Software Cost Estimation (Case Study: Projects in NASA60 Dataset)
Estimating the costs of software development is one of the most important activities in software project management. Inaccuracies in such estimates may cause irreparable loss. A low estimate of the cost of projects will result in failure on delivery on time and indicates the inefficiency of the software development team. On the other hand, high estimates of resources and costs for a project wil...
متن کاملA Budgeting Model for the Safety Unit of an Under Construction Metro Station in Tehran Using a Robust Optimization
Background: The construction of metro lines is a high-risk project. Using a budget-based model for the safety units of metro construction projects can help safety managers to spend optimal budget allocation. The purpose of this study was to plan a budget model based on safety unit performance in an under construction metro station for better budget allocation using robust optimization. Methods...
متن کاملConceptual estimating tool for technology-driven projects: exploring parametric estimating technique
This paper examines a parametric estimating technique applied to technology-driven projects. Parametric cost estimating is a widely used approach for bidding on a contract, input into a cost benefit analysis, or as the pre-planning tool for project implementation. Extensive literature reviews suggest that effective parametric estimating methodology is becoming an essential tool for technology-d...
متن کاملSoftware Effort Estimation Based on Use Case Point (Fuzzy Logic)
Software cost estimation is a crucial part of the software project initiation process. Cost estimation plays an important role in the bidding/budgeting and help managers to use their resources at the maximum output level. Software Project failure rate is very high in case the project cost estimation is not done by taking all the important factors into the consideration. So finding the cost at t...
متن کاملDEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY
Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- IJHCITP
دوره 1 شماره
صفحات -
تاریخ انتشار 2010