Response of Asce Task Committee Test Cases to Open-loop Control Measures
نویسندگان
چکیده
Automated openand closed-loop control systems can enhance the performance of irrigation delivery systems. This paper examines the response of the canal test cases developed by the ASCE task committee on canal automation algorithms to a particular anticipatory open-loop control technique, gate stroking. The performance of the ideal gate-stroking solution is compared with the performance of an approximate gatestroking schedule that was generated by imposing practical constraints on the frequency and magnitude of the gate adjustments. Also analyzed were the performance of a nonanticipatory open-loop control scheme and the effect of model parameter uncertainties on the effectiveness of the control. For the test cases, the approximate gate-stroking schedules performed similarly to the ideal schedules. For two of the test cases, delivery performance was similar with and without anticipation, but was substantially different for the other two tests. The quality of the control degraded as a result of errors in model parameters, particularly in cases with incorrect check gate calibrations and submerged gate flows. Results point out the importance of combining openand closed-loop control measures to improve the overall effectiveness of the control.
منابع مشابه
Volume Compensation Method for Routing Irrigation Canal Demand Changes
This paper examines the problem of routing known water demands through gate-controlled, open-channel irrigation delivery systems. Volume-compensation principles were used to route multiple demands in multiple-pool canal systems. The volume-compensation method schedules each demand change individually under the assumption of a series of steady states and superimposes the individual results. Volu...
متن کاملBenchmark structural control problem for a seismically excited highway bridge: Phase I and II
Benchmark problems in structural response control have served the international structural controls community as virtual test beds to compare different control algorithms since the first benchmark problem was proposed in 1996 through the sponsorship of the ASCE Structural Control Committee and Task Group on Benchmark Problems, the U.S. Panel on structural control, and International Association ...
متن کاملWhat Do Experienced Water Managers Think of Water Resources of Our Nation and Its Management Infrastructure?
This article represents the second report by an ASCE Task Committee "Infrastructure Impacts of Landscape-driven Weather Change" under the ASCE Watershed Management Technical Committee and the ASCE Hydroclimate Technical Committee. Herein, the 'infrastructure impacts" are referred to as infrastructure-sensitive changes in weather and climate patterns (extremes and non-extremes) that are modulate...
متن کاملStructural control benchmark problem: Phase II—Nonlinear smart base-isolated building subjected to near-fault earthquakes
Many branches of engineering, mathematics, and sciences, have relied on benchmark problems as a standard means to compare different solution techniques. Since 1996, the ASCE Structural Control and Monitoring Committee and Task Group on Benchmark Problems, the U.S. Panel on structural control, and IASCM have developed a series of benchmark control problems that offer a set of carefully modeled r...
متن کاملCorrelation Between Functional Balance and Mobility Tests and Postural Sway Measures in Dual Task Paradigm in Parkinson’s Disease (a Pilot Study)
Objective: The present study was aimed to correlate the clinical tests with the laboratory measures under dual task conditions in Parkinson's disease (PD). Materials and Methods: Eleven people with idiopathic PD (Modified Hoehn and Yahr scores 1-3) were selected by simple non-probability sampling. Center of pressure (COP) data obtained by force platform was used to calculate mean total velocity...
متن کامل