Single Machine Scheduling Subject To Precedence Delays

نویسندگان

  • Lucian Finta
  • Zhen Liu
چکیده

A single-machine scheduling problem with precedence delays is analyzed. A set of n tasks is to be scheduled on the machine in such a way that the makespan is minimized. The executions of the tasks are constrained by precedence delays, i.e., a task can start its execution only after any of its predecessors has completed and the delay between the two tasks has elapsed. In the case of unit execution times and integer lengths of delays, the problem is shown to be NP-hard in the strong sense. In the case of integer execution times and unit length of delays, the problem is polynomial, and an O(n 2) optimal algorithm is provided. Both preemptive and non-preemptive cases are considered.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs

This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...

متن کامل

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

A 2.542-approximation for precedence constrained single machine scheduling with release dates and total weighted completion time objective

We present a √ e/( √ e−1)-approximation algorithm for the nonpreemptive scheduling problem to minimize the total weighted completion time of jobs on a single machine subject to release dates and precedence constraints. The previously best known approximation algorithm dates back to 1997; its performance guarantee can be made arbitrarily close to the Euler constant e [18].

متن کامل

Scheduling Jobs with Communication Delays: Using Infeasible Solutions for Approximation

In the last few years, multi-processor scheduling with interprocessor communication delays has received increasing attention. This is due to the more realistic constraints in modeling parallel processor systems. Most research in this vein is concerned with the makespan criterion. We contribute to this work by presenting a new and simple ( 2 1)-approximation algorithm for scheduling to minimize ...

متن کامل

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints

This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Discrete Applied Mathematics

دوره 70  شماره 

صفحات  -

تاریخ انتشار 1996