Optimisation of decision making under uncertainty throughout field lifetime: A fractured reservoir example

نویسندگان

  • Dan Arnold
  • Vasily V. Demyanov
  • Mike Christie
  • Alexander Bakay
  • Konstantin Gopa
چکیده

Assessing the change in uncertainty in reservoir production forecasts over field lifetime is rarely undertaken because of the complexity of joining together the individual workflows. This becomes particularly important in complex fields such as naturally fractured reservoirs. The impact of this problem has been identified in previous and many solutions have been proposed but never implemented on complex reservoir problems due to the computational cost of quantifying uncertainty and optimising the reservoir development, specifically knowing how many and what kind of simulations to run. This paper demonstrates a workflow that propagates uncertainty throughout field lifetime, and into the decision making process by a combination of a metric-based approach, multi-objective optimisation and Bayesian estimation of uncertainty. The workflow propagates uncertainty estimates from appraisal into initial development optimisation, then updates uncertainty through history matching and finally propagates it into late-life optimisation. The combination of techniques applied, namely the metric approach and multi-objective optimisation, help evaluate development options under uncertainty. This was achieved with a significantly reduced number of flow simulations, such that the combined workflow is computationally feasible to run for a real-field problem. This workflow is applied to two synthetic naturally fractured reservoir (NFR) case studies in appraisal, field development, history matching and mid-life EOR stages. The first is a simple sector model, while the second is a more complex full field example based on a real life analogue. This study infers geological uncertainty from an ensemble of models that are based on the carbonate Brazilian outcrop which are propagated through the field lifetime, before and after the start of production, with the inclusion of production data significantly collapsing the spread of P10-P90 in reservoir forecasts. The workflow links uncertainty estimation with the appropriate optimisation at appraisal, development and reservoir management stages to maximise oil recovery under uncertainty.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Balancing and Ranking Method based on Hesitant Fuzzy Sets for Solving Decision-making Problems under Uncertainty

The purpose of this paper is to extend a new balancing and ranking method to handle uncertainty for a multiple attribute analysis under a hesitant fuzzy environment. The presented hesitant fuzzy balancing and ranking (HF-BR) method does not require attributes’ weights through the process of multiple attribute decision making (MADM) under hesitant conditions. For the rating of possible alternati...

متن کامل

Assessment of Green Supplier Development Programs by a New Group Decision-Making Model Considering Possibilistic Statistical Uncertainty

The assessment and selection of green supplier development programs are an intriguing and functional research subject. This paper proposes a group decision-making approach considering possibilistic statistical concepts under uncertainty to assess green supplier development programs (GSDPs) via interval-valued fuzzy sets (IVFSs). Possibility theory is employed to regard uncertainty by IVFSs. A n...

متن کامل

Decision Making Under Uncertainty: Applying the Least-Squares Monte Carlo Method in Surfactant-Flooding Implementation

This study introduces a decision-making evaluation method for flexibility in surfactant flooding. The method aims to capture the effects of uncertainty in the time series for both technical and economic parameters and produce a near-optimal policy with respect to these uncertainties as they vary with time. The evaluation method used was the least-squares Monte Carlo (LSM) method, which is best-...

متن کامل

A New Compromise Decision-making Model based on TOPSIS and VIKOR for Solving Multi-objective Large-scale Programming Problems with a Block Angular Structure under Uncertainty

This paper proposes a compromise model, based on a new method, to solve the multi-objective large-scale linear programming (MOLSLP) problems with block angular structure involving fuzzy parameters. The problem involves fuzzy parameters in the objective functions and constraints. In this compromise programming method, two concepts are considered simultaneously. First of them is that the optimal ...

متن کامل

Sustainable Energy Planning By A Group Decision Model With Entropy Weighting Method Under Interval-Valued Fuzzy Sets And Possibilistic Statistical Concepts

In this paper, a new interval-valued fuzzy multi-criteria group decision-making model is proposed to evaluate each of the energy plans with sustainable development criteria for proper energy plan selection. The purpose of this study is divided into two parts: first, it is aimed at determining the weights of evaluation criteria for sustainable energy planning and second at rating sustainable ene...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & Geosciences

دوره 95  شماره 

صفحات  -

تاریخ انتشار 2016