Modelling and heuristics of FMS scheduling with multiple objectives
نویسندگان
چکیده
The performance of a scheduling system, in practice, is not evaluated to satisfy a single objective, but to obtain a trade-off schedule regarding multiple objectives. Therefore, in this research, we make use of one of the multiple objective decision-making methods, a global criterion approach, to develop a multi-objective model for solving FMS scheduling problems with consideration of three performance measures, namely minimum mean job flow time, mean job tardiness, and minimum mean machine idle time, simultaneously. In addition, hybrid heuristics, which are a combination of two common local search methods, simulated annealing and tabu search, are also proposed for solving the addressed FMS scheduling problems. The feasibility and adaptability of the proposed heuristics are investigated through experimental results. 2004 Elsevier Ltd. All rights reserved.
منابع مشابه
Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line
This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...
متن کاملTruck Scheduling in a Cross-Docking Terminal by Using Novel Robust Heuristics
Nowadays, one of the major goals of the distribution environment is to reduce lead times and inventories. Cross-docking is a logistics technique which removes the storage and picking up the functions of a warehouse. The term cross-docking refers to moving products directly from incoming to outgoing trailers with little or no storage in between. According to the recent related papers, the truck ...
متن کاملA Scheduling Model of Flexible Manufacturing System to Reduce Waste and Earliness/Tardiness Penalties
Nowadays, flexible manufacturing system (FMS) is introduced as a response to the competitive environment. Scheduling of FMS is more complex and more difficult than the other scheduling production systems. One of the main factors in scheduling of FMS is variable time of taking orders from customers, which leads to a sudden change in the manufacturing process. Also, some problems are created in p...
متن کاملFMS scheduling with knowledge based genetic algorithm approach
In this paper a complex scheduling problem in flexible manufacturing system (FMS) has been addressed with a novel approach called knowledge based genetic algorithm (KBGA). The literature review indicates that meta-heuristics may be used for combinatorial decision-making problem in FMS and simple genetic algorithm (SGA) is one of the meta-heuristics that has attracted many researchers. This nove...
متن کاملScheduling Problem of Virtual Cellular Manufacturing Systems (VCMS); Using Simulated Annealing and Genetic Algorithm based Heuristics
In this paper, we present a simulated annealing (SA) and a genetic algorithm (GA) based on heuristics for scheduling problem of jobs in virtual cellular manufacturing systems. A virtual manufacturing cell (VMC) is a group of resources that is dedicated to the manufacturing of a part family. Although this grouping is not reflected in the physical structure of the manufacturing system, but machin...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & OR
دوره 33 شماره
صفحات -
تاریخ انتشار 2006