European Organization for Nuclear Research Cern - Sl Division Cern-sl-2000-033 Bt a Novel Eddy Current Septum Magnet for Sps Extraction towards Lhc and Cngs

نویسندگان

  • G. H. Schröder
  • W. Weisser
  • E. Carlier
  • J. H. Dieperink
  • L. Ducimetière
  • B. Goddard
  • C. Lazar
  • W. Weterings
  • M. Mayer
  • E. B. Vossenberg
چکیده

A new East Fast-Extraction System is under construction in the SPS, to supply particles with a maximum batch length of 7.8 μs and 10.5 μs to the LHC and to CNGS (CERN Neutrino to Gran Sasso), respectively. The extraction septum magnets actually used at the SPS have been designed for slow extraction over several seconds and have large cooling and electrical power demands. A fast system of only 250 μs pulse duration has therefore been developed, using a half-sine excitation pulse with a superimposed third harmonic. The short pulse duration requires very thin magnetic yoke laminations, which can not easily be stamped and stacked. Profiting from a development for the LHC beam dump kicker magnets, the yoke is therefore built-up from tapewound cylindrical cores, employing 50 μm thick Si-steel tape. Thirty two cores are stacked longitudinally to produce a yoke of 3.2 meter length. The aperture is cut in radial direction into each cylinder. The cores are radial compressed by spring-loaded pistons inserted in strong stainless-steel frames to provide mechanical stability. The 5+1 mm-thick copper/iron septum is separated from the excitation current loop and acts as a passive eddy current screen. This allows separating the vacuum of the magnet from that of the circulating-beam channel, avoiding the need of using UHV material. This paper presents the magnet and generator prototype design as well as simulation and measurement results. Presented at EPAC2000, 26-30 June 2000, Vienna, Austria Geneva, Switzerland July 2000 A NOVEL EDDY CURRENT SEPTUM MAGNET FOR SPS EXTRACTION TOWARDS LHC AND CNGS . G.H. Schröder, W. Weisser, E. Carlier, J.H. Dieperink, L. Ducimetière, B. Goddard, C. Lazar, M. Mayer, E.B. Vossenberg and W. Weterings CERN, Geneva, Switzerland

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

European Organization for Nuclear Research Cern – Sl Division Cern-sl-2000-036 Bt the New Sps Extraction Channel for Lhc and Cngs

The Large Hadron Collider (LHC) and CERN Neutrino to Gran Sasso (CNGS) projects require the construction of a new fast-extraction system in the long straight section LSS4 of the Super Proton Synchrotron (SPS) at CERN. A conventional DC septum magnet will be used, in conjunction with the installation of horizontal and vertical extraction bumpers, main quadrupoles with enlarged apertures, extract...

متن کامل

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN – SL DIVISION SL-Note-2001-031 HRF Longitudinal stability of the LHC beam in the SPS

Longitudinal beam stability is analysed for the LHC beam in the SPS. The most critical area is shown to be the top energy. Analysis explains some results of measurements with the beam done during MDs last year. The possibility of using this cycle for CNGS is considered as well. There, without special requirements on bunch parameters at extraction, the impedance limitations move to the lowest en...

متن کامل

European Organization for Nuclear Research Cern – Sl Division Cern-sl-2000-018 Ea Cngs - Cern Neutrinos to Gran Sasso

The CNGS project was approved by CERN Council in December 1999. This report gives a short description of the νμ beam to be built at CERN in the direction of the INFN Gran Sasso underground laboratory (LNGS). The first goal of this new facility is the production of sufficient νμ in an energy region optimised for the detection of an adequate number of ντ produced by oscillation at LNGS. The layou...

متن کامل

European Organization for Nuclear Research Cern Sl Division

See the introduction in next page. EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN SL DIVISION 2 Energy Spectrum Measurement of the Multipacting Electrons in the SPS. Analysis of the Possible Utilisation of the BGIP Monitor ------------------------------------------------------------------------------------------------------------------------Mauro Pivi CERN – LHC Division – VAC Group Alessandro...

متن کامل

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN – SL DIVISION CERN-SL-2000-071 (AP) Impedance Evaluation of the SPS MKE Kicker with Transition Pieces between Tank and Kicker Module

In this paper we discuss longitudinal beam coupling impedance measurements performed with the coaxial wire method on a modified prototype of the SPS MKE kicker. The frequency dependent real and imaginary part of the distributed coupling impedance are obtained from the measured S-parameters by standard and improved log-formulae. A comparison with theoretical models and previous measurements is d...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2000