Flexible Flowshop with Limited Intermediate Storage

نویسنده

  • ALI K. UNVER
چکیده

In this project, we first planned to model a manufacturing system using a partial differential equation (PDE), since in the theory of traffic simulation and control, PDEs are used successfully for modeling the dynamic behavior of highway traffic. Because these traffic models show good correspondence with manufacturing systems (vehicles = products, highway = manufacturing system), PDEs can also be useful in the modeling of manufacturing systems [1]. The PDE, which we were planning to use in this project, is the Conservation Law given as follows

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Flowshop Schedules with Sequence Dependent Setup Times

The flowshop scheduling problem with sequence dependent setup times is considered and shown to be NP-complete. A traveling salesman problem formulation is proposed for the case where jobs are processed continuously through the shop. These results are used to describe an approximate algorithm for the case where limited or infinite intermediate storage space is available to hold partially complet...

متن کامل

Solving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm

In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...

متن کامل

Flexible flowshop scheduling with equal number of unrelated parallel machines

This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly ge...

متن کامل

َA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times

This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presen...

متن کامل

Complexity and Mathematical Model for Flowshop Problem Subject to Different Types of Blocking Constraint

Storage or buffer capacities between successive machines in flowshop problems may be unlimited, limited or null. Two last cases can lead to blocking situations. In flowshop scheduling literature, many studies and research were realized about classical flowshop problem and also about some problems with only one blocking situation. This paper deals with makespan minimization in flowshop schedulin...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006