Information Management in Civil Engineering Infrastructural Development: with Focus of Modelling of Geological and Geotechnical Information
نویسندگان
چکیده
In civil engineering infrastructural projects, information exchange and (re-) use in and between involved parties is difficult. This is mainly caused by a lack of information harmonization. Various specialists are working together on the development of an infrastructural project and are all using their own specific software and definitions for the various information types. The variety of information types adds to the differences regarding the use and definition of thematic semantic information. Also the source of the information may vary from surveyed and interpreted to designed objects. This makes harmonization of geo-information extremely difficult. Realistic 3D models describing and integrating part of the earth already exist, but are generally neglecting the subsurface, and especially the aspects of geological and geotechnical information. This paper summarizes the first steps undertaken towards the extension of an existing integrated semantic information model to include (above and on) surface as well as subsurface objects and in particular, subsurface geological and geotechnical objects. Standards, exchange formats and existing models used as a basis for the development of a core geological model as part of an integrated 3D information model are described in this paper. Examples of definitions of subsurface geological objects and required attribute information (to be) included in the integrated 3D information model are given. Web-based visualisation tools are, too, investigated to be able to access and visualise the model also in an application-independent environment.
منابع مشابه
Information Management in Civil Engineering Infrastructural Development: with Focus on Geological and Geotechnical Information
In civil engineering infrastructural projects, information exchange and (re-) use in and between involved parties is difficult. This is mainly caused by a lack of information harmonization. Various specialists are working together on the development of an infrastructural project and are all using their own specific software and definitions for the various information types. The variety of infor...
متن کاملMunicipal Waste Landfill Site Selection based on Environmental, Geological and Geotechnical Multi-criteria: A Case Study
Waste management is a complex and detailed process that involves evaluation of certain important factors, such as a geological, geotechnical, hydrological, hydrogeological, climate, urban management, environmental, along with social, cultural, and psychological parameters. Unfortunately, in Iran, there is minimal evaluation of initial parameters and in some cases even don’t exist. The purpose o...
متن کاملBearing Capacity Zoning of Shallow Foundations in District 1 in Shiraz Municipality Using Geographic Information System (GIS)
This research presents the geotechnical zoning map of district 1 in Shiraz municipality with focus on allowable bearing capacity of foundation based on data from 160 boreholes. For this purpose, the mechanical properties are determined according to the results of direct shear, uniaxial, and SPT tests and then safe bearing capacity for strip foundations with widths of 1, 1.5, 2, and 2.5 m, and f...
متن کاملDetermining of Geotechnical Domain Based on Joint Density and Fault Orientation at Batu Hijau Mine,West Sumbawa-Indonesia (TECHNICAL NOTE)
The research area is located at Batu Hijau Mine – PT Amman Mineral Nusa Tenggara, administratively located at the southwestern of Sumbawa, West Nusa Tenggara Province – Indonesia. The research area is controlled by tectonism in accordance to close with the active tectonic plate at southern part of this island. The presence of the active tectonic regime causes of the rich deposit of ore minerali...
متن کاملDeep Excavation Hazard Assessment Zoning in District 1 in Shiraz Municipality Using Geographic Information System (GIS)
This research presents the geotechnical zoning map of district 1 in Shiraz municipality with focus on municipal deep excavation hazard assessment on data from 160 boreholes. For this purpose, the mechanical properties are determined according to the results of direct shear, uniaxial, and SPT tests and then excavation hazard assessment with depths of 3, 6 and 9 m, in situations where the excavat...
متن کامل