Teaching of Critical Path Networks Using Software Packages

نویسنده

  • Harry Ku
چکیده

The aim of this paper is to review a published paper, ‘Using computer software packages to enhance the teaching of Engineering Management Science: Part 1 –Critical path networks’. Excel in Microsoft Office 2007 was discovered to be able to solve critical path network problems with some programming. The capabilities of the two previously evaluated packages, Microsoft Project 2007 and Quantitative Methods – Production and Operations Management (POM-QM) for Windows 3 were cited and Excel usage is explained for each of the objective of the module, critical path networks. A pseudo quantity scoring system was developed to evaluate the capabilities of the software packages in meeting the 5 objectives of the module. It was found that POM-QM for Windows 3 scored the highest points. However, Excel in MS can be argued to provide the best learning outcomes as it endeavours students to understand the concepts of critical path networks clearly before they can program and solve the problems.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Algorithm to Obtain Possibly Critical Paths in Imprecise Project Networks

  We consider criticality in project networks having imprecise activity duration times. It is well known that finding all possibly critical paths of an imprecise project network is an NP-hard problem. Here, based on a method for finding critical paths of crisp networks by using only the forward recursion of critical path method, for the first time an algorithm is proposed which can find all pos...

متن کامل

A New Approach to Approximate Completion Time Distribution Function of Stochastic Pert Networks

The classical PERT approach uses the path with the largest expected duration as the critical path to estimate the probability of completing a network by a given deadline. However, in general, such a path is not the most critical path (MCP) and does not have the smallest estimate for the probability of completion time. The main idea of this paper is derived from the domination structure between ...

متن کامل

تحلیل محتوای بسته های آموزشی پیشگیری از اعتیاد سازمان بهزیستی

Objective: The aim of this research was to conduct a content analysis on addiction prevention educational packages related to Welfare Organization based on addiction prevention components. Method: A qualitative research method and content analysis based on Shannon entropy model were used for the conduct of this study. The statistical population of the study included all educational packages of ...

متن کامل

An Experiment in Teaching Database Concepts Independent of Software Platform

This paper examines Information Systems teaching, as opposed to training, in the context of a Database Concepts course. The course was developed using the IS 2002 model curriculum as a guide, with specific effort made to focus on teaching students fundamental concepts and techniques while using a branded RDBMS software package as a tool for instruction. The course was taught by the same instruc...

متن کامل

An Efficient Method for Selecting a Reliable Path under Uncertainty Conditions

In a network that has the potential to block some paths, choosing a reliable path, so that its survival probability is high, is an important and practical issue. The importance of this issue is very considerable in critical situations such as natural disasters, floods and earthquakes. In the case of the reliable path, survival or blocking of each arc on a network in critical situations is an un...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009