Material Requirement Planning under Fuzzy Lead Times
نویسندگان
چکیده
This paper proposes a fuzzy multi-objective integer linear programming approach to model a material requirement planning (MRP) problem with fuzzy lead times. We incorporate to the crisp MRP model the possibility of occurrence of each one of the possible lead times. Then, an objective function that maximizes the possibility of occurrence of the lead times is considered. By combining this objective with the initials of the MRP model, decision makers can play with their risk attitude of admitting lead times that improve the other objectives but have a minor possibility of occurrence.
منابع مشابه
Material Requirement Planning with fuzzy constraints and fuzzy coefficients
Wepropose a new fuzzymathematical programmingmodel for production planning under uncertainty in an industrial environment. This model considers fuzzy constraints related to the total costs, the market demand and the available capacity of the productive resources and fuzzy coefficients for the costs due to the backlog of demand and for the required capacity. The main goal is to determine the mas...
متن کاملGenetic algorithm for multi-level assembly systems under stochastic lead times
The aim of this paper is to propose tools to adapt and parameterize the Material Requirement Planning (MRP) method under lead time uncertainty. We study multi-level assembly systems with one type of finished products and several types of components. We consider that each component has a fixed unit inventory cost and the finished product has a backlogging cost per unit of time. The lead times of...
متن کاملFuzzy Queuing Approach for Designing Multi Supplier Systems (Case: SAPCO Company)
The importance of reliable supply is increasing with supply chain network extension and just-in-time (JIT) production. Just in time implications motivate manufacturers towards single sourcing, which often involves problems with unreliable suppliers. If a single and reliable vendor is not available, manufacturer can split the order among the vendors in order to simultaneously decrease the supp...
متن کاملRefueling problem of alternative fuel vehicles under intuitionistic fuzzy refueling waiting times: a fuzzy approach
Using alternative fuel vehicles is one of the ways to reduce the consumption of fossil fuels which have many negative environmental effects. An alternative fuel vehicle needs special planning for its refueling operations because of some reasons, e.g. limited number of refueling stations, uncertain refueling queue times in the stations, variable alternative fuel prices among the stations, etc. I...
متن کاملApplication of Fuzzy mathematical programming approach to the aggregate production/distribution planning in a supply chain network problem
This paper presented an application of Fuzzy mathematical programming model to solve network design problems for supply chains via considering aggregate production planning (APP). APP goals to minimize all costs through optimal levels of production, subcontracting, inventory, backorder and work levels over a time period to meet the demand. Fuzzy logic was applied to solve the uncertain producti...
متن کامل