Integrating noncyclical preventive maintenance scheduling and production planning for a single machine

نویسندگان

  • Mohamed-Chahir Fitouhi
  • Mustapha Nourelfath
چکیده

This paper deals with the problem of integrating noncyclical preventive maintenance and tactical production planning for a single machine. We are given a set of products that must be produced in lots during a specified finite planning horizon. The maintenance policy suggests possible preventive replacements at the beginning of each production planning period, and minimal repair at machine failure. The proposed model determines simultaneously the optimal production plan and the instants of preventive maintenance actions. The objective is to minimize the sum of preventive and corrective maintenance costs, setup costs, holding costs, backorder costs and production costs, while satisfying the demand for all products over the entire horizon. The problem is solved by comparing the results of several multi-product capacitated lot-sizing problems. The value of the integration and that of using noncyclical preventive maintenance when the demand varies from one period to another are illustrated through a numerical example and validated by a design of experiment. The later has shown that the integration of maintenance and production planning can reduce the total maintenance and production cost and the removal of periodicity constraint is directly affected by the demand fluctuation and can also reduce the total maintenance and production cost. & 2011 Elsevier B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Integrating noncyclical preventive maintenance scheduling and production planning for multi-state systems

This paper integrates noncyclical preventive maintenance with tactical production planning in multistate systems. The maintenance policy suggests noncyclical preventive replacements of components, and minimal repair on failed components. The model gives simultaneously the appropriate instants for preventive maintenance, and production planning decisions. It determines an integrated lot-sizing a...

متن کامل

Periodic flexible maintenance planning in a single-machine production environment

Preventive maintenance is the essential part of many maintenance plans. From the production point of view, the flexibility of the maintenance intervals enhances the manufacturing efficiency. On the contrary, the maintenance departments tend to know the timing of the long term maintenance plans as certain as possible. In a single-machine production environment, this paper proposes a simulation–o...

متن کامل

Flow shop Scheduling Problem with Maintenance Coordination: a New Approach

This study investigates the coordination of production scheduling and maintenance planning in theflow shop scheduling environment. The problem is considered in a bi-objective form, minimizing themakespan as the production scheduling criterion and minimizing the system unavailability as themaintenance planning criterion. The time interval between consecutive maintenance activities as well as the...

متن کامل

JIT single machine scheduling problem with periodic preventive maintenance

This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...

متن کامل

Integrated production planning and preventive maintenance in deteriorating production systems

This paper discusses the issue of integrating production planning and preventive maintenance in manufacturing production systems. In particular, it tackles the problem of integrating production and preventive maintenance in a system composed of parallel failure-prone production lines. It is assumed that when a production line fails, a minimal repair is carried out to restore it to an ‘as-bad-as...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015