Salt River Project Canal Automation Pilot Project: Simulation Tests

نویسندگان

  • E. Bautista
  • R. J. Strand
چکیده

The feasibility of automatically controlling water levels and deliveries on the Salt River Project SRP canal system through computer-based algorithms is being investigated. The proposed control system automates and enhances functions already performed by SRP operators, namely feedforward routing of scheduled demand changes, feedback control of downstream water levels, and flow control at check structures. Performance of the control system was tested with unsteady flow simulation. Test scenarios were defined by the operators for a 30 km, four-pool canal reach. The tests considered the effect of imperfect knowledge of check gate head-discharge relationships. The combined feedback-feedforward controller easily kept water level deviations close to the target when dealing with routine, scheduled flow changes. Those same routine changes, when unscheduled, were handled effectively by the feedback controller alone. The combined system had greater difficulty in dealing with large demand changes, especially if unscheduled. Because feedback flow changes are computed independently of feedforward changes, the feedback controller tends to counteract feedforward control actions. The effect is unimportant when dealing with routine flow changes but is more significant when dealing with large changes, especially in cases where the demand change cannot be fully anticipated. DOI: 10.1061/ ASCE 0733-9437 2006 132:2 143 CE Database subject headings: Canals; Open channel flow; Flow control; Feedback control; Automation; Arizona.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Why Model-Based Test Automation is Different and What You Should Know to Get Started

Test engineers, their managers, as well as the project developers often have many different views and misconceptions about tools and methods that provide test automation support. This paper compares model-based testing with three other generations of test automation. Model-based test automation can be considered a fourth generation test automation. It supports defect prevention, early requireme...

متن کامل

Detecting and Simulating Pilot Errors for Safety Enhancement

This paper presents research on computational models of pilot activities for detecting and simulating pilot errors, and discusses how these techniques may be used to enhance aviation safety. The discussion addresses improved feedback about pilot errors to support training, and the use of actual and simulated error data to understand how errors may impact new air traffic management concepts and ...

متن کامل

A novel Human Machine Interaction (HMI) design/ evaluation approach supporting the advancement of improved automation concepts to enhance flight safety

This paper presents a novel Human Machine Interaction (HMI) design/evaluation methodology, supporting the specification and evaluation of a new adaptive automation concept, both from a functional and an operational/safety perspective. This methodology has been advanced as part of the work requirements for the Applying Pilot Models for Safety Aircraft (A-PiMod) project, funded by the European Co...

متن کامل

Integrated approach for scenario-based flood simulation

This paper present recent achievements obtained within the context of the ANFAS project (Data fusion for flood simulation and decision support). The overal objective of ANFAS was to set up an integrated system for flood prevention and protection. Data fusion and models fusion techniques constitute the core of the scientific research work of the project. Data fusion refers to the use of multi-so...

متن کامل

Developing an Integrated Simulation Model of Bayesian-networks to Estimate the Completion Cost of a Project under Risk: Case Study on Phase 13 of South Pars Gas Field Development Projects

Objective: The aim of this paper is to propose a new approach to assess the aggregated impact of risks on the completion cost of a construction project. Such an aggregated impact includes the main impacts of risks as well as the impacts of interactions caused by dependencies among them. Methods: In this study, Monte Carlo simulation and Bayesian Networks methods are combined to present a frame...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006