Optimal Energy Procurement in Spot and Forward Markets

نویسندگان

  • Nicola Secomandi
  • Sunder Kekre
چکیده

Storage capacity for energy, such as electricity, natural gas, and oil, is limited. Thus, spot and forward purchases for delivery on the usage date play an important role in matching the supply and the uncertain demand of energy. Transaction costs tend to be larger in spot than forward energy, and more generally commodity, markets. Hence, partially procuring supply in the forward market, rather than entirely in the spot market, is a potentially valuable real option. We call this option the forward procurement option. The study of this option from the perspective of differential transaction costs has received little attention in the literature. We thus formulate and analyze a parsimonious procurement model with differential spot and forward transaction costs and correlated spot demand and nominal price random variables. Our analysis, in part based on natural gas data, sheds novel light on the value of the forward procurement option and its optimal exercise, as well as their sensitivities to parameters of interest. Our main insight is that procuring the demand forecast in the forward market is nearly optimal on the instances that we consider. This greatly simplifies the management of this option. We obtain analogous results with a richer model in which the supply procured in the forward market is delivered at multiple dates. Beyond energy, our research has potential relevance for the procurement of other commodities, such as metals and agricultural products.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Commodity Procurement with Demand Forecast and Forward Price Updates

Commodities, ranging from natural gas to memory chips, can be procured both by trading on the date in spot markets and in advance in forward markets. Transaction costs, such as brokerage fees, are typically higher in spot markets than in forward markets. Moreover, the forecast of a firm’s commodity requirement (demand) for a given future date typically changes in an uncertain fashion over time....

متن کامل

رویکرد تحلیلی در تعیین میزان بهینه ی قراردادهای پیش فروش

Due to volatility of spot power prices and in order to manage risk of a Generating Company (GenCo), this paper addresses determination of optimal quantity of bilateral forward contracts which can be formulated as an optimization problem. In this framework, in addition to selling electricity to spot market, bilateral forward contracts can be traded between Gencos and customers. Finding an optima...

متن کامل

Analyzing Capacity Withholding in Oligopoly Electricity Markets Considering Forward Contracts and Demand Elasticity

In this paper capacity withholding in an oligopolistic electricity market that all Generation Companies (GenCos) bid in a Cournot model is analyzed and the capacity withheld index, the capacity distortion index and the price distortion index are obtained and formulated. Then a new index, Distortion-Withheld Index (DWI), is proposed in order to measure the potential ability of market for capacit...

متن کامل

Optimal procurement of long-term contracts in the presence of imperfect spot market ¬リニ

B2B spot market has grown rapidly and become an effective trading channel for commodity products. Besides long-term contract procurement from conventional suppliers (forward and option), a buyer can procure or sell commodities at any time in B2B spot market to adjust her inventory level. However, spot prices are generally volatile and the market is imperfect in the sense that spot trading may b...

متن کامل

Integrating Contracting and Spot Procurement with Capacity Options

This paper develops a framework for integrating contract markets with spot markets using tradable options for capacity. Sellers and Buyers may either contract for delivery in advance (the \contracting" option) or they may sell and buy some or all of their output/input in a spot market. Contract pricing involves both a reservation fee per unit of capacity and an execution fee per unit of output ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Manufacturing & Service Operations Management

دوره 16  شماره 

صفحات  -

تاریخ انتشار 2014