Risk-based integrated production scheduling and electricity procurement for continuous power-intensive processes
نویسندگان
چکیده
For optimal operation of power-intensive plants, production scheduling and electricity procurement have to be considered simultaneously. In addition, uncertainty needs to be taken into account. For this purpose, an integrated stochastic mixed-integer linear programming model is developed that considers the two most critical sources of uncertainty: spot electricity price, and product demand. Conditional value-at-risk is incorporated into the model as a measure of risk. Furthermore, scenario reduction and multicut Benders decomposition are implemented to solve large-scale real-world problems. The proposed model is applied to an illustrative example as well as an industrial air separation case. The results show the benefit from stochastic optimization and the effect of taking a risk-averse rather than a risk-neutral approach. An interesting insight from the analysis is that in risk-neutral optimization, accounting for electricity price uncertainty does not yield significant added value; however, in risk-averse optimization, modeling price uncertainty is crucial for obtaining good solutions.
منابع مشابه
Electricity Procurement for Large Consumers with Second Order Stochastic Dominance Constraints
This paper presents a decision making approach for mid-term scheduling of large industrial consumers based on the recently introduced class of Stochastic Dominance (SD)- constrained stochastic programming. In this study, the electricity price in the pool as well as the rate of availability (unavailability) of the generating unit (forced outage rate) is considered as uncertain parameters. Th...
متن کاملEnterprise-wide Optimization for Industrial Demand Side Management
In the light of increasing volatility in electricity price and availability, demand side management (DSM), which refers to the active management of electricity consumption, has become crucial for the economic performance of power-intensive industries. Due to its time-sensitive nature, DSM is a challenge for industrial plants; however, it can also be an opportunity if sufficient process flexibil...
متن کاملIntegrated Procurement, Production and Delivery Scheduling in a Generalized three Stage Supply Chain
In this research, we investigate a three-stage supply chain with one supplier, several manufacturers and multiple retailers where the supplier provides a common raw material to each manufacturer, who in turn uses a single stage production facility to convert it into final products that are delivered at fixed lot sizes to retailers. An integrated economic procurement, production, and delivery mo...
متن کاملDay-ahead economic dispatch of coupled desalinated water and power grids with participation of compressed air energy storages
Nowadays, water and electricity are closely interdependent essential sources in human life that affect socio-economic growth and prosperity. In other words, electricity is a fundamental source to supply a seawater desalination process, while fresh water is used for cooling this power plant. Therefore, mutual vulnerability of water treatment and power generation systems is growing because of inc...
متن کاملRobust Scheduling under Time-sensitive Electricity Prices for Continuous Powerintensive Processes
Optimization models for the production scheduling of power-intensive processes such as air separation can help realizing significant economical savings. However, if the electricity is procured in the dayahead or real-time market, the forecast for the hourly electricity prices contains a significant amount of uncertainty. In this work, we apply robust optimization to the uncertain electricity pr...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & Chemical Engineering
دوره 86 شماره
صفحات -
تاریخ انتشار 2016