A semi-automated approach to generate 4D/5D BIM models for evaluating different offshore oil and gas platform decommissioning options
نویسندگان
چکیده
Background: Offshore oil and gas platforms generally have a lifetime of 30 to 40 years, and platform decommissioning is a major issue because many of the existing offshore oil and gas platforms are reaching the end of their service life. There are many possible options for decommissioning offshore oil and gas platforms, and each decommissioning option can be implemented using different methods and technologies. Therefore, it is necessary to have a clear understanding and in-depth evaluation of each decommissioning option before commencing platform decommissioning. 4D and 5D building information modeling (BIM) has been commonly used in the building industry to analyze constructability and to evaluate different construction or demolition plans. However, application of BIM in the oil and gas industry, especially for the platform decommissioning process, is still limited. Methods: This paper suggests and demonstrates the application of 4D and 5D BIM technology to simulate various methodologies to realize various selected offshore platform decommissioning options, thereby visualizing and evaluating different options, considering both the time and resources required for decommissioning process. One hundred and seventy-seven offshore platform decommissioning options are summarized in this paper. A new approach to create multiple 4D/5D BIM models in a semi-automated manner for evaluating various scenario options of OOGP decommissioning was proposed to reduce the model creation time as current way of 4D/5D BIM model creation for each OOGP decommissioning option is time consuming. Results: In the proposed approach, an OOGP BIM model relationship database that contains possible 4D/5D BIM model relationships (i.e. schedules for different decommissioning methods) for different parts of an OOGP was generated. Different OOGP decommissioning options can be simulated and visualized with 4D/5D BIM models created by automatically matching schedules, resources, cost information and 3D BIM models. This paper also presents an illustrative example of the proposed approach, which simulates and evaluates two decommissioning options of a fixed jacket platform, namely Rig-to-Reef and Removal-to-Shore. As compared to the traditional approach of 4D/5D BIM model generation, the proposed semi-automated approach reduces the model generation time by 58.8% in the illustrative example. (Continued on next page) * Correspondence: [email protected] Department of Civil and Environmental Engineering, The Hong Kong University of Science and Technology, Hong Kong, China Full list of author information is available at the end of the article © The Author(s). 2017 Open Access This article is distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made. Cheng et al. Visualization in Engineering (2017) 5:12 Page 2 of 13 (Continued from previous page) Conclusions: The proposed approach of semi-automated 4D/5D BIM model creation can help understand the implication of different decommissioning options as well as applied methods, detecting potential lifting clashes, and reducing 4D/5D BIM model creation time, leading to better planning and execution for the decommissioning of offshore oil and gas platforms. In addition, with the proposed semi-automated approach, the 4D/5D BIM model can be generated in a more efficient manner.
منابع مشابه
Evaluating alternatives for decommissioning California's offshore oil and gas platforms.
This paper introduces a series of 6 additional papers in this issue that describe an in-depth analysis of options for decommissioning oil and gas platforms offshore southern California. Although current leases require lessees in both state and federal waters to completely remove all production facilities and restore the seafloor to its pre-platform condition, other options have emerged since th...
متن کاملEcological and political issues surrounding decommissioning of offshore oil facilities in the Southern California Bight
To aid legislators, resource managers, and the general public, this paper summarizes and clarifies some of the issues and options that the federal government and the state of California face in decommissioning offshore oil and gas production platforms, particularly as these relate to platform ecology. Both local marine ecology and political climate play a role in decommissioning offshore oil pr...
متن کاملCost-Benefit Investigation of Offshore Wind Power Generation for Soroush Offshore Complex
Iranian offshore oil and gas platforms are mostly located in the Persian Gulf. Technical and environmental challenges resulted from an off-design running condition of processes on a platform are important issues. The weakness of strategies to stop or decrease the amount of greenhouse gas emission production rate in the Persian Gulf; which is intensively increasing, is another matter of concern....
متن کاملA multi-attribute decision analysis for decommissioning offshore oil and gas platforms.
The 27 oil and gas platforms off the coast of southern California are reaching the end of their economic lives. Because their decommissioning involves large costs and potential environmental impacts, this became an issue of public controversy. As part of a larger policy analysis conducted for the State of California, we implemented a decision analysis as a software tool (PLATFORM) to clarify an...
متن کاملSeismic Reliability Evaluation of the Jacket Structure of an Offshore Platform Based on Nonlinear Time History Analyses
Regarding the previous earthquake damages in offshore structures, as vital structures in the oil and gas industries, it is important that their seismic design will be performed with very high reliability. Accepting the Nonlinear Time History Analyses (NLTHA) as the most reliable seismic analysis method, in this paper an offshore platform of jacket type with the height of 304 feet and with a dec...
متن کامل