A Note on Ending Inventory Valuation in Multiperiod Production Scheduling

نویسندگان

  • Wilco van den Heuvel
  • Albert P.M. Wagelmans
چکیده

A Note on Ending Inventory Valuation in Multiperiod Production Scheduling Wilco van den Heuvel • Albert P.M. Wagelmans Econometric Institute Report EI 2002-25 Econometric Institute, Erasmus University Rotterdam, PO Box 1738, 3000 DR Rotterdam, The Netherlands [email protected][email protected] June 2002 In a recent paper, Fisher et al. (2001) present a method to mitigate end-effects in lot sizing by including a valuation term for end-of-horizon inventory in the objective function of the shorthorizon model. Computational tests show that the proposed method outperforms the WagnerWhitin algorithm and the Silver-Meal heuristic, under several demand patterns, within a rolling horizon framework. We replicate the computational tests also including a straightforward method that assumes the same knowledge about future demand as the ending inventory valuation method. Our results indicate that the superior performance reported by Fisher et al. is to a large extent due to the fact that their method assumes that quite accurate knowledge about future demand is available, whereas the traditional methods do not use any information about demand beyond the short model horizon. Moreover, when quite accurate knowledge about future demand is indeed available, our results suggest that for some demand patterns, ending inventory valuation is not the most effective way to use this knowledge. Furthermore, we point out a minor mistake in the results reported by Fisher et al. (End Effects; Dynamic Lot Sizing; Ending Inventory Valuation)

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal Pricing and Production Master Planning in a Multiperiod Horizon Considering Capacity and Inventory Constraints

We formulate and solve a single-item joint pricing and master planning optimization problem with capacity and inventory constrains. The objective is to maximize profits over a discretetime multiperiod horizon. The solution process consists of two steps. First, we solve the singleperiod problem exactly. Second, using the exact solution of the single-period problem, we solve the multiperiod probl...

متن کامل

A Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)

Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...

متن کامل

Integration of control theory and scheduling methods for supply chain management

The supply chain is a system comprising organizations, decision makers, and technology decision policies that is responsible for transforming raw materials into finished products that are delivered to end customers. As expanded upon later in the paper, the supply chain is traditionally characterized by counter-current flows of information and material. Material flows from the raw material suppl...

متن کامل

Optimum Aggregate Inventory for Scheduling Multi-product Single Machine System with Zero Setup Time

In this paper we adopt the common cycle approach to economic lot scheduling problem and minimize the maximum aggregate inventory. We allow the occurrence of the idle times between any two consecutive products and consider limited capital for investment in inventory. We assume the setup times are negligible. To achieve the optimal investment in inventory we first find the idle times which minimi...

متن کامل

Technical Note: An opportunity cost maintenance scheduling framework for a fleet of ships: A case study

The conventional method towards deriving schedule for a fleet of ships to minimize cost alone has the short-coming of not addressing the problem of operation revenue losses associated with delays during maintenance at ships dockyards. In this paper, a preventive maintenance schedule for a fleet of ships that incorporates op-portunity cost is presented. The idea is to assign a penalty cost to al...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002