Supply Chain Management with Overtime and Premium Freight

نویسندگان

  • Eric Logan Huggins
  • Tava Lennon Olsen
چکیده

We consider a two-stage supply chain under centralized control. The downstream facility faces discrete stochastic demand and passes supply requests to the upstream facility. The upstream facility always meets the supply requests from downstream. If the upstream facility can not meet the supply requests from inventory on hand, the shortage must be filled by either overtime production and/or premium freight shipments, both incurring per unit and setup costs. Overtime production occurs at the end of the period and incurs relatively high production costs; premium freight refers to building products at the beginning of the period they are needed and shipping them very quickly with relatively high shipping costs. Focusing primarily on the case where only one method of filling shortages is available, we determine novel optimal inventory policies under centralized control. At both stages, threshold policies that depend only on the current inventory in the system are optimal; for the total inventory in the system, a base-stock policy is optimal. Numerical analysis provides insight into the optimal policies and allows us to compare the supply chain under centralized and decentralized control.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Supply Chain Management with Guaranteed Delivery

We consider a two-stage supply chain under centralized control. The downstream facility faces discrete stochastic demand and passes supply requests to the upstream facility. The upstream facility always meets the supply requests from downstream. If the upstream facility cannot meet the supply requests from inventory on hand, the shortage must be filled by expediting, which will incur per unit a...

متن کامل

Inventory Control with Overtime and Premium Freight

We consider a manufacturer that must fill stochastic demand. When shortages occur, the manufacturer may choose to meet the unmet demand with overtime production and/or by premium freight shipments. We derive optimal production policies for regular and overtime production and discuss the tradeoffs involved.

متن کامل

Analysis of Ethical Decision-Making Barriers in Operations and Supply Chain Management

Background: In order to reduce the adverse effects of unethical decision-making in the operations function of firms, this study was conducted to identify and determine the causal relationships governing ethical decision barriers in operations and supply chain management. Method: This research is applied in terms of purpose and survey in terms of data acquisition. The research population includ...

متن کامل

Wage-Hours Contracts, Overtime Working and Premium Pay

Wage-Hours Contracts, Overtime Working and Premium Pay This paper offers a contract-based theory to explain the determination of standard hours, overtime hours and overtime premium pay. We expand on the wage contract literature that emphasises the role of firm-specific human capital and that explores problems of contract efficiency in the face of information asymmetries between the firm and the...

متن کامل

An RFID Case Study for Air Cargo Supply Chain Management

Air freight is an important part of the global supply chain. In particular, various high-value electronic products need to be transported efficiently by air freight. Currently, many air freight forwarders still rely on manual operations to process air cargo. These manual operations may affect target service levels due to handling delays and human errors, and result in high operational costs. In...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002