Determining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issues

نویسنده

  • S. W. Chiu
چکیده

EPQ model; Replenishment lot size; Multiple deliveries; Random defective items; Production; Rework; Scrap items. Abstract This paper derives the optimal replenishment lot size and shipment policy for an Economic Production Quantity (EPQ) model with multiple deliveries and rework of random defective items. The classic EPQmodel assumes a continuous inventory issuing policy for satisfying demand and perfect quality for all items produced. However, in a real life vendor–buyer integrated system, multi-shipment policy is practically used in lieu of continuous issuing policy and generation of defective items is inevitable. It is assumed that the imperfect quality items fall into two groups: the scrap and the rework-able items. Failure in repair exists, hence additional scrap items generated. The finished items can only be delivered to customers if thewhole lot is quality assured at the end of rework. Mathematical modeling is used in this study and the long-run average production–inventory-delivery cost function is derived. Convexity of the cost function is proved by using the Hessianmatrix equations. The closed-form optimal replenishment lot size and optimal number of shipments that minimize the long-run average costs for such an EPQ model are derived. Special case is examined, and a numerical example is provided to show its practical usage. © 2012 Sharif University of Technology. Production and hosting by Elsevier B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Replenishment Lot Size and Number of Shipments for Epq Model Derived without Derivatives

This paper investigates optimal replenishment lot size and optimal number of shipments for economic production quantity (EPQ) model with rework process using an algebraic approach. The classic EPQ model assumes a perfect quality production for all items produced and a continuous issuing policy for satisfying customer‟s demand. However, in a real life vendor-buyer integrated-production-inventory...

متن کامل

Deriving the Optimal Production-Shipment Policy with Imperfect Quality and an Amending Delivery Plan using Algebraic Method

This paper derives the optimal production-shipment policy for a vendor-buyer integrated system with imperfect quality and an amending product delivery plan using an algebraic method. It is assumed that the system may randomly produce certain portion of nonconforming products during each production run. Quality assurance in terms of inspection and rework has been given effect to the defective it...

متن کامل

Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown

a r t i c l e i n f o The optimal replenishment policy for an economic production quantity (EPQ)-based inventory model with nonconforming items and breakdown is presented. A real-life production system inevitably generates nonconforming items and has equipment breakdowns owing to process deterioration or other uncontrollable factors. This study addressed these issues in an EPQ-based system to o...

متن کامل

Computational Optimization of Manufacturing Batch Size and Shipment for an Integrated EPQ Model with Scrap

This paper employs mathematical modeling and algebraic approach to derive the optimal manufacturing batch size and number of shipment for a vendor-buyer integrated economic production quantity (EPQ) model with scrap. Unlike the conventional method by using differential calculus to determine replenishment lot size and optimal number of shipments for such an integrated system, this paper proposes...

متن کامل

Optimal replenishment decision in an EPQ model with defective items under supply chain trade credit policy

The traditional inventory of the economic order quantity model assumes perfect items in an ordered lot and an infinite replenishment rate. However, such conditions are rare in actual production environments. Additionally, most studies of this problem have only considered suppliers offering the wholesaler a grace period. In practice, wholesalers often extend a fixed credit period to downstream c...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015