Component Commomality and Shortage Reduction under a Mixed Erlang Distributed Demand

نویسندگان

  • Haizhen Fu
  • Duncan K. H. Fong
چکیده

This paper addresses an inventory control problem when common components are allowed and the goal is to minimize the expected units shortage subject to a budget constraint. A two-level assemble-to-order product structure is analyzed when the demands for two end products follow independent mixtures of Erlang distributions. Closed form expressions for the objective function under various scenarios are presented and efficient algorithms for computing the optimal inventory stock levels are developed. Relative reductions in the expected units shortage under different demand patterns and budget availability situations when introducing commonality are evaluated and compared. It is found that, for all demand patterns considered, the relative reduction can be substantial when the inventory budget is large. Thus, if a company wants to improve an already high service level for an essential item, introducing commonality may be an option without having to increase the inventory to an unbearable level. Also, given a fixed budget, our numerical results suggest that the case of independent and identically distributed demands produces the largest relative reduction in expected units shortage. Benefits from employing commonality can be insignificant, however, where the demands are very different. KeywordsInventory models, Component commonality, Erlang demand distributions ∗ Corresponding author’s email: [email protected] 1813-713X copyright © 2006 ORSTW

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Threshold F-policy and N-policy for multi-component machining system with warm standbys

The integration of marketing and demand with logistics and inventories (supply side of companies) may cause multiple improvements; it can revolutionize the management of the revenue of rental companies, hotels, and airlines. In this paper, we develop a multi-objective pricing-inventory model for a retailer. Maximizing the retailer's profit and the service level are the objectives, and shorta...

متن کامل

Optimal operation of the microgrid in presence of electric vehicles considering demand response

Microgrid is a collection of electric loads, distributed generation units and battery storage operating as a controllable load which is able to supply the local loads. Air pollution due to fossil fueled vehicles increase by faculties development. Besides, shortage in fossil fuels increase the trends into electric vehicles. In this paper, optimal stochastic operation problem of microgrid in pres...

متن کامل

Coordinated resource scheduling in a large scale virtual power plant considering demand response and energy storages

Virtual power plant (VPP) is an effective approach to aggregate distributed generation resources under a central control. This paper introduces a mixed-integer linear programming model for optimal scheduling of the internal resources of a large scale VPP in order to maximize its profit. The proposed model studies the effect of a demand response (DR) program on the scheduling of the VPP. The pro...

متن کامل

Fuel Consumption Reduction and Energy Management in Stand-Alone Hybrid Microgrid under Load Uncertainty and Demand Response by Linear Programming

A stand-alone microgrid usually contains a set of distributed generation resources, energy storage system and loads that can be used to supply electricity of remote areas. These areas are small in terms of population and industry. Connection of these areas to the national distribution network due to the high costs of constructing transmission lines is not economical. Optimal utilization and eco...

متن کامل

Cost Benefit Analysis of Series Systems with Mixed Standby Components and k-stage Erlang Repair Time

In this paper, we compare the availability characteristics between three different series system configurations with mixed (cold and warm) standby components and k-stage Erlang repair times. Three configurations are studied under the assumption that the time-to-failure for each of the operative and warm standby components are assumed to be exponentially distributed with parameters λ andα , resp...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -