Evaluation of the impact of a total automation system in a large core laboratory on turnaround time.
نویسندگان
چکیده
BACKGROUND Growing financial and workload pressures on laboratories coupled with user demands for faster turnaround time (TAT) has steered the implementation of total laboratory automation (TLA). The current study evaluates the impact of a complex TLA on core laboratory efficiency through the analysis of the In-lab to Report TAT (IR-TAT) for five representative tests based on the different requested priorities. METHODS Mean, median and outlier percentages (OP) for IR-TAT were determined following TLA implementation and where possible, compared to the pre-TLA era. RESULTS The shortest mean IR-TAT via the priority lanes of the TLA was 22min for Complete Blood Count (CBC), followed by 34min, 39min and 40min for Prothrombin time (PT), urea and potassium testing respectively. The mean IR-TAT for STAT CBC loaded directly on to the analyzers was 5min shorter than that processed via the TLA. The mean IR-TATs for both STAT potassium and urea via offline centrifugation were comparable to that processed by the TLA. The longest mean IR-TAT via regular lanes of the TLA was 62min for Thyroid-Stimulating Hormone (TSH) while the shortest was 17min for CBC. All parameters for IR-TAT for CBC and PT tests decreased significantly post- TLA across all requested priorities in particular the outlier percentage (OP) at 30 and 60min. CONCLUSIONS TLA helps to efficiently manage substantial volumes of samples across all requested priorities. Manual processing for small STAT volumes, at both the initial centrifugation stage and front loading directly on to analyzers, is however likely to yield the shortest IR-TAT.
منابع مشابه
Automated transport and sorting system in a large reference laboratory: part 1. Evaluation of needs and alternatives and development of a plan.
BACKGROUND Our laboratory, a large, commercial, esoteric reference laboratory, sought some form of total laboratory automation to keep pace with rapid growth of specimen volumes as well as to meet competitive demands for cost reduction and improved turnaround time. METHODS We conducted a systematic evaluation of our needs, which led to the development of a plan to implement an automated trans...
متن کاملThe Evaluation of Error Types and Turnaround Time of Preanalytical Phase in Biochemistry and Hematology Laboratories
Background& Objective: Each laboratory should determine the type of errors and turnaround time (TAT), especially in the preanalytical phase to report quality and timeliness of the test results. The current study aimed at investigating the common causes of preanalytical errors in biochemistry and hematology laboratories and evaluating the preanalytical ...
متن کاملA Simulation Model for Optimization of the Internal Handling Fleet Size at Shahid Rajaee Container Port Based on Performance Evaluation
The dramatic increasing of sea-freight container transportations and the developing trend for using containers in the multimodal handling systems through the sea, rail, road and land in the present market cause some challenges to the general managers of container terminals such as increasing demand, competitive situation, new investments and expansion of new activities and the need to use new m...
متن کاملLean six sigma process improvement in specimen receiving to improve stat chemistry turnaround times
Objective: As a consequence of stat turnaround times (TATs) chronically exceeding 60 minutes, our laboratory was facing pressure to divert limited resources toward the implementation of an emergency department satellite laboratory. Peer-reviewed literature in clinical laboratory quality assurance and improvement indicates that between 60-70% of errors occur at the pre-analytical level. Thus...
متن کاملAutomated transport and sorting system in a large reference laboratory: part 2. Implementation of the system and performance measures over three years.
BACKGROUND Our laboratory implemented a major automation system in November 1998. A related report describes a 4-year process of evaluation and planning leading to system installation. This report describes the implementation and performance results over 3 years since the system was placed into use. METHODS Project management software was used to track the project. Turnaround times of our top...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Clinical biochemistry
دوره 49 16-17 شماره
صفحات -
تاریخ انتشار 2016