A Global Constraint for Total Weighted Completion Time
نویسندگان
چکیده
We introduce a novel global constraint for the total weighted completion time of activities on a single unary capacity resource. For propagating the constraint, an O(n) algorithm is proposed, which makes use of the preemptive mean busy time relaxation of the scheduling problem. The solution to this problem is used to test if an activity can start at each start time in its domain in solutions that respect the upper bound on the cost of the schedule. Empirical results show that the proposed global constraint significantly improves the performance of constraint-based approaches to single-machine scheduling for minimizing the total weighted completion time. Since our eventual goal is to use the global constraint as part of a larger optimization problem, we view this performance as very promising. We also sketch the application of the global constraint to cumulative resources and to problems with multiple machines.
منابع مشابه
Extensions of the COMPLETION Constraint
The COMPLETION global constraint has been proposed for single-machine, unary-resource, total weighted completion time scheduling problems where it has shown good performance. In this paper, we look at extending the constraint in two ways. First, we apply the constraint to multiple machine scheduling problems, in the form of job shop scheduling. It is shown that under the right allocation of wei...
متن کاملA global constraint for total weighted completion time for cumulative resources
The criterion of total weighted completion time occurs as a sub-problem of combinatorial optimization problems in such diverse areas as scheduling, container loading and storage assignment in warehouses. These applications often necessitate considering a rich set of requirements and preferences, which makes constraint programming (CP) an effective modeling and solving approach. On the other han...
متن کاملAn Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time
This paper explores the flexile flow lines where setup times are sequence- dependent. The optimization criterion is the minimization of total weighted completion time. We propose an iterated greedy algorithm (IGA) to tackle the problem. An experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of IGA are compared against those of some other exist...
متن کاملAn FPTAS of Minimizing Total Weighted Completion Time on Single Machine with Position Constraint
In this paper we study the classical scheduling problem of minimizing the total weighted completion time on a single machine with the constraint that one specific job must be scheduled at a specified position. We give dynamic programs with pseudo-polynomial running time, and a fully polynomial-time approximation scheme (FPTAS). 1998 ACM Subject Classification F.2.2
متن کاملA Multi-Objective Particle Swarm Optimization Algorithm for a Possibilistic Open Shop Problem to Minimize Weighted Mean Tardiness and Weighted Mean Completion Times
We consider an open shop scheduling problem. At first, a bi-objective possibilistic mixed-integer programming formulation is developed. The inherent uncertainty in processing times and due dates as fuzzy parameters, machine-dependent setup times and removal times are the special features of this model. The considered bi-objectives are to minimize the weighted mean tardiness and weighted mean co...
متن کامل