Poor construction, not time, takes its toll on subsidised fences designed to deter large carnivores

نویسندگان

  • Jens Frank
  • Ann Eklund
چکیده

Large carnivore conservation may be considered as successful in Sweden, as wolf (Canis lupus), lynx (Lynx lynx), brown bear (Ursus arctos), golden eagles (Aquila chrysaetos), and wolverine (Gulo gulo) populations have recovered from extinction or near extinction to viable populations during the last three decades. Particularly the wolf and lynx populations have returned at the cost of an increasing number of carnivore attacks on domestic livestock. To support coexistence between carnivores and livestock production, the Swedish authorities subsidise interventions to prevent or reduce the number of carnivore attacks. The most commonly used intervention is carnivore deterring fencing, and all livestock owners can apply for subsidies to build a fence. To receive reimbursement the fence must be approved by the authorities according to predefined criteria. An important part of any management aiming to be adaptive is evaluating interventions. In this paper we evaluate to what extent previously subsidised fences still meet the criteria 1-15 years after their approval. Of 296 fences that had received subsidies in the county of Värmland, 100 randomly selected fences were revisited in 2016. From this subsample 14% of the fences still met the initial criteria for subsidies. None of the fences that still fulfilled the criteria were more than 8 years old, whereas fences with identified failures occurred in all age groups. Of the 86 fences that failed to meet the criteria, construction failures were the most commonly occurring problem. Maintenance failures, wear and tear, only explain a minor part of the failures. To improve the quality of fencing, as well as the quality and longevity of the subsidies programme, there is a need for improved communication between authorities, and improved communication and support from the authorities to livestock producers before and during construction of fences, as well as more rigorous inspection when the fences are built.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimization of time and temperature of dam construction for thermal analysis of RCC dam

In RCC dams, usually large amounts of concrete are poured in a short time that the heat generated by the cement hydration has led to an increase in temperature in the dam body. In this research, Abacus software, which is a finite element software, has been used for thermal analysis of the dam during construction and concreting. This is how thermal changes are applied. For the structure of 50 c...

متن کامل

Implications of floodplain aquaculture enclosure

Bangladesh has extensive floodplain wetlands covering over 4 million ha. These remain an important source of livelihood fish contribute about 60% of national animal protein consumption, and wetland plants are used for fodder, food and construction. Over fishing, short term leasing of use rights, flood control and drainage, and pollution all have negative impacts. In contrast several projects ha...

متن کامل

ارائه یک زمانبندی بهینه تخصیص منابع مالی در یک پروژه طراحی و ساخت نیروگاه آبی بر اساس پارامترهای تصادفی فازی با استفاده از الگوریتم هیبریدی

Currently considering increasing investment in large projects by the private sector and implementation of projects with many techniques such as design, construction and financing plan with financing is very important. This paper is considering uncertainty in time and cost of various activities a project planning, financial resources for loans should be a way to finance a project cost is lowes...

متن کامل

The role of the Transport System in the Economic Development of Bosnia and Herzegovina

The article discusses the impact of transport system on economic development in Bosnia and Herzegovina. Transition or the process of restructuring the economy and society in Bosnia and Herzegovina is taking place very intensively, but also in very difficult and special conditions. Construction of new and expansion and reconstruction of existing roads in Bosnia and Herzegovina is the assumption ...

متن کامل

A Time Dependent Pollution Routing Problem in Multi-graph

This paper considers a time dependent(the travel time is not constant throughout the day) pollution routing problem (TDPRP), which aids the decision makers in minimizing travel time, toll cost and emitted pollution cost.  In complexity of urban areas most of the time one point is accessible from another with more than one edge. In contrast to previous TDPRP models, which are designed with only ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره 12  شماره 

صفحات  -

تاریخ انتشار 2017