A Study on the S 2 - EWMA Chart for Monitoring the Process Variance based on the MRL Performance (
نویسندگان
چکیده
The existing optimal design of the fixed sampling interval S2-EWMA control chart to monitor the sample variance of a process is based on the average run length (ARL) criterion. Since the shape of the run length distribution changes with the magnitude of the shift in the variance, the median run length (MRL) gives a more meaningful explanation about the in-control and out-of-control performances of a control chart. This paper proposes the optimal design of the S2-EWMA chart, based on the MRL. The Markov chain technique is employed to compute the MRLs. The performances of the S2EWMA chart, double sampling (DS) S2 chart and S chart are evaluated and compared. The MRL results indicated that the S2-EWMA chart gives better performance for detecting small and moderate variance shifts, while maintaining almost the same sensitivity as the DS S2 and S charts toward large variance shifts, especially when the sample size increases.
منابع مشابه
A STUDY OF THE MEDIAN RUN LENGTH (MRL) PERFORMANCE OF THE EWMA t CHART FOR THE MEAN
The exponentially weighted moving average (EWMA) X chart is effective in detecting small shifts. However, the EWMA X chart is not robust enough to prevent errors in estimating the process standard deviation or a changing standard deviation. To overcome this problem, Zhang et al. suggested the EWMA t chart in 2009. The existing optimal design of the EWMA t chart is based on the average run lengt...
متن کاملMonitoring Lognormal Reliability Data in a Two-Stage Process Using Accelerated Failure Time Model
The reliability data is getting used to monitor and improve the quality of products or services. Nowadays, most of products or services are the results of processes with dependent stages referred to as multi-stage process. In these processes, the quality characteristics are affected by the quality characteristics in the previous stages, called as cascade property. In some cases, it is not possi...
متن کاملMonitoring Fuzzy Capability Index $widetilde{C}_{pk}$ by Using the EWMA Control Chart with Imprecise Data
A manufacturing process cannot be released to production until it has been proven to be stable. Also, we cannot begin to talk about process capability until we have demonstrated stability in our process. This means that the process variation is the result of random causes only and all assignable or special causes have been removed. In complicated manufacturing processes, such as drilling proces...
متن کاملA Simple Approach for Monitoring Business Service Time Variation
Control charts are effective tools for signal detection in both manufacturing processes and service processes. Much of the data in service industries comes from processes having nonnormal or unknown distributions. The commonly used Shewhart variable control charts, which depend heavily on the normality assumption, are not appropriately used here. In this paper, we propose a new asymmetric EWMA ...
متن کاملA Self-starting Control Chart for Simultaneous Monitoring of Mean and Variance of Simple Linear Profiles
In many processes in real practice at the start-up stages the process parameters are not known a priori and there are no initial samples or data for executing Phase I monitoring and estimating the process parameters. In addition, the practitioners are interested in using one control chart instead of two or more for monitoring location and variability of processes. In this paper, we consider a s...
متن کامل