A Communication Scheduling Algorithm for Multi-FPGA Systems
نویسندگان
چکیده
∗ Effort sponsored by Defense Advanced Research Projects Agency (DARPA) through the Air Force Research Laboratory, USAF, under agreement numbers F30602-99-1-0521, F30602-97-1-0222, and F33615-98-C-1320. The U.S. Government is authorized to reproduce and distribute reprints for governmental purposes notwithstanding any copyright annotation thereon. The views and conclusions contained herein are those of the authors and should not interpreted as necessarily representing the official policies or endorsement, either expressed or implied, of the Defense Advanced Research Projects Agency (DARPA), Air Force Research Laboratory, or the U.S. Government. Abstract
منابع مشابه
Pre-scheduling and Scheduling of Task Graph on Homogeneous Multiprocessor Systems
Task graph scheduling is a multi-objective optimization and NP-hard problem. In this paper a new algorithm on homogeneous multiprocessors systems is proposed. Basically, scheduling algorithms are targeted to balance the two parameters of time and energy consumption. These two parameters are up to a certain limit in contrast with each other and improvement of one causes reduction in the othe...
متن کاملPre-scheduling and Scheduling of Task Graph on Homogeneous Multiprocessor Systems
Task graph scheduling is a multi-objective optimization and NP-hard problem. In this paper a new algorithm on homogeneous multiprocessors systems is proposed. Basically, scheduling algorithms are targeted to balance the two parameters of time and energy consumption. These two parameters are up to a certain limit in contrast with each other and improvement of one causes reduction in the othe...
متن کاملDiscrete Multi Objective Particle Swarm Optimization Algorithm for FPGA Placement (RESEARCH NOTE)
Placement process is one of the vital stages in physical design. In this stage, modules and elements of circuit are placed in distinct locations according to optimization basis. So that, each placement process tries to influence on one or more optimization factor. In the other hand, it can be told unequivocally that FPGA is one of the most important and applicable devices in our electronic worl...
متن کاملA Hybrid Modeling for Continuous Casting Scheduling Problem
This paper deals with a multi-agent-based interval type-2 fuzzy (IT2F) expert systemfor scheduling steel continuous casting. Continuous caster scheduling is a complex and extensiveprocess that needs expert staff. In this study, a distributed multi-agent-based structure is proposed as asolution. The agents used herein can cooperate with each other via various communication protocols.To facilitat...
متن کاملDevelopment of Model and Algorithm for Depot Balancing Multi-Depot Vehicle Scheduling Problem Considering Depot Balancing
The main of multi-depot vehicle scheduling problem (MDVSP) is to schedule the timetabled trips using limited resources, optimally. The problem is very important in the management of the transportation systems. One of the most useful ways to better manage these systems is to consider the real conditions including depot balancing constraints. To normalize the number of vehicles departed from each...
متن کاملScheduling driven circuit partitioning algorithm for multiple FPGAs using time-multiplexed, off-chip, multi-casting interconnection architecture
The gate utilization of FPGAs and speed of emulation in multi-FPGA system are limited by the interconnection architecture and the number of pins. The time-multiplexing of interconnection wires is required for multi-FPGA systems incorporating several state-of-the-art FPGAs. This article proposes a circuit partitioning algorithm called SCheduling driven Algorithm for TOMi (SCATOMi) for multi-FPGA...
متن کامل