A Multistage Decision-Dependent Stochastic Bi-level Programming Approach for Power Generation Investment Expansion Planning
نویسندگان
چکیده
In this paper, we study the long-term power generation investment expansion planing problem under uncertainty. We propose a bilevel optimization model that includes an upper-level multistage stochastic expansion planning problem and a collection of lower-level economic dispatch problem. This model seeks for the optimal sizing and siting for both thermal and wind power units to be built to maximize the expected profit for a profit-oriented power generation investor. To address the future uncertainties in the decision-making process, this paper employs decision-dependent stochastic programming approach. In the scenario tree, we calculate the nonstationary transition probabilities based on discrete choice theory and the economies of scale theory in electricity systems. The model is further reformulated as a single-level optimization problem, and solved by decomposition algorithms. The investment decisions, computational times, and the optimality of the decision-dependent model are evaluated by case studies on IEEE reliability test systems. The results show that the proposed decision-dependent model provides effective investment plans for long-term power generation expansion planning.
منابع مشابه
Regulatory Impacts on Distributed Generation and Upstream Transmission Substation Expansion Planning: A Novel Stochastic Bi-level Model
In this paper, a novel framework is proposed to study impacts of regulatory incentive on distributed generation (DG) investment in sub-transmission substations, as well as upgrading of upstream transmission substations. Both conventional and wind power technologies are considered here. Investment incentives are fuel cost, firm contracts, capacity payment and investment subsidy relating to wind ...
متن کاملDecision-Dependent Stochastic Generation Expansion Planning with Large Amounts of Wind Power
Power generation expansion planning needs to deal with future uncertainties carefully, given that the invested generation assets will be in operation for a long time. Many stochastic programming models have been proposed to tackle this challenge. However, most previous works assume predetermined future uncertainties (i.e., fixed random outcomes with given probabilities). In several recent studi...
متن کاملA Multi-objective Transmission Expansion Planning Strategy: A Bilevel Programming Method
This paper describes a methodology for transmission expansion planning (TEP) within a deregulated electricity market. Two objective functions including investment cost (IC) and congestion cost (CC) are considered. The proposed model forms a bi-level optimization problem in which upper level problem represents an independent system operator (ISO) making its decisions on investment while in the l...
متن کاملA Fuzzy Multi Objective Programming Model for Power Generation and Transmission Expansion Planning Problem
The increasing consumption of electricity over time forces different countries to establishnew power plants and transmission lines. There are various crisp single-objective mathematicalmodels in the literature for the long-term power generation and transmission expansion planning tohelp the decision makers to make more reasonable decisions. But, in practice, most of the parametersassociated wit...
متن کاملStochastic Programming Model for Power Generation
We consider power system expansion planning under uncertainty. In our approach, integer programming and stochastic programming provide a basic framework. We develop a multistage stochastic programming model in which some of the variables are restricted to integer values. By utilizing the special property of the problem, called block separable recourse, the problem is transformed into a two-stag...