Approximation Algorithms for a Directed Network Design Problem
نویسندگان
چکیده
We present a 4-approximation algorithm for a class of directed network design problems. The network design problem is to find a minimum cost subgraph such that for each vertex set S there are at least f(S) arcs leaving the set S. In the last 10 years general techniques have been developed for designing approximation algorithms for undirected network design problems. Recently, Kamal Jain gave a 2-approximation algorithm for the case when the function f is weakly supermodular. There has been very little progress made on directed network design problems. The main techniques used for the undirected problems do not extend to the directed case. András Frank has shown that in a special case when the function f is intersecting supermodular the problem can be solved optimally. In this paper, we use this result to get a 2-approximation algorithm for a more general case when f is crossing supermodular. Another important result of the paper is the extension of Jain’s techniques to directed problems. Particularly, we prove that if the function f is crossing supermodular, then any basic solution of the LP relaxation of our problem contains at least one variable with value greater or equal to 1/4.
منابع مشابه
Approximation Solutions for Time-Varying Shortest Path Problem
Abstract. Time-varying network optimization problems have tradition-ally been solved by specialized algorithms. These algorithms have NP-complement time complexity. This paper considers the time-varying short-est path problem, in which can be optimally solved in O(T(m + n)) time,where T is a given integer. For this problem with arbitrary waiting times,we propose an approximation algorithm, whic...
متن کاملA stochastic network design of bulky waste recycling – a hybrid harmony search approach based on sample approximation
Facing supply uncertainty of bulky wastes, the capacitated multi-product stochastic network design model for bulky waste recycling is proposed in this paper. The objective of this model is to minimize the first-stage total fixed costs and the expected value of the second-stage variable costs. The possibility of operation costs and transportation costs for bulky waste recycling is considered ...
متن کاملAgent-based approach for cooperative scheduling
This paper studies the multi-factory production (MFP) network scheduling problem where a number of different individual factories join together to form a MFP network, in which these factories can operate more economically than operating individually. However, in such network which known as virtual production network with self-interested factories with transportation times, each individual facto...
متن کاملNetwork Design Problems with Bounded Distances via Shallow-Light Steiner Trees
In a directed graph G with non-correlated edge lengths and costs, the network design problem with bounded distances asks for a cost-minimal spanning subgraph subject to a length bound for all node pairs. We give a bi-criteria (2 + ε,O(n0.5+ε))-approximation for this problem. This improves on the currently best known linear approximation bound, at the cost of violating the distance bound by a fa...
متن کاملSolving a Multi-Item Supply Chain Network Problem by Three Meta-heuristic Algorithms
The supply chain network design not only assists organizations production process (e.g.,plan, control and execute a product’s flow) but also ensure what is the growing need for companies in a longterm. This paper develops a three-echelon supply chain network problem including multiple plants, multiple distributors, and multiple retailers with amulti-mode demand satisfaction policy inside of pro...
متن کامل