Departure of the Expert Systems Project Champion

نویسنده

  • Janice C. Sipior
چکیده

This article discusses the expert system (ES) project champion by examining the experiences of Ciba-Geigy Corporation with an ES project, impeded by the departure of the project champion. The OpBright Expert System, developed to support the identification of appropriate optical brightener products by sales representatives, was intended to provide a competitive advantage through superior customer service. With the promotion and transfer of the vital force committed to the project’s success, the ES encountered a stalemate. The difficulties in maintaining momentum for the ES without a project champion are discussed. Finally, suggestions are presented to guide organizations away from the same fate.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Development of a Generic Risk Matrix to Manage Project Risks

A generic risk matrix is presented for use identifying and assessing project risks quickly and cost effectively. It assists project managers with few resources to perform project risk analysis. The generic risk matrix (GRM) contains a broad set of risks that are categorized and ranked according to their potential impact and probability of occurrence. The matrix assists PMs in quickly identifyin...

متن کامل

Developing a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System

Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...

متن کامل

Safety Risks Impacts Analysis on Construction Project Objectives Using a Hybrid Model of Fuzzy Expert System and Latin Hyper Cube Sampling

Background and aims: The construction industry has a high rate of fatal or nonfatal injuries and all around the world which remains one of the most dangerous occupations till now. Since project safety and measuring danger in the construction industry is a crucial subject, so this study aimed to measure the impacts of safety risks on the time and cost objectives of project using a hybrid method ...

متن کامل

Road Departure Avoidance System Based on the Driver Decision Estimator

In this paper a robust road departure avoidance system based on a closed-loop driver decision estimator (DDE) is presented. The main idea is that of incorporating the driver intent in the control of the vehicle. The driver decision estimator computes the vehicle look ahead lateral position based on the driver input and uses this position to establish the risk of road departure. To induce a risk...

متن کامل

Understanding The ERP Project Champion Role And Its Criticality

Existence of an adequate project champion role has been identified as a critical success factor in ERP implementation projects. However, the figure of the project champion is not yet quite well understood. Some authors relate it with the project sponsor figure while others relate it with the project manager figure. This paper tries to clarify these concepts. Our research framework has been base...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005