Alternative approach for production lot size problem with scrap and cost reduction distribution policy
نویسندگان
چکیده
Conventional approach for solving replenishment lot size problem is by using the differential calculus with the need of applying the first-order and second-order differentiations to the long-run average production-inventory cost. A recent published paper used conventional method to determine optimal lot size for an integrated production-delivery system with scrap and cost lessening distribution policy. This paper uses an alternative algebraic approach to reexamine the aforementioned problem without referring to derivatives. As a result, optimal lot size and a simpler expression for the long-run average cost are derived, and they are identical to what were obtained by using the conventional method.
منابع مشابه
Deriving the Optimal Production-Shipment Policy with Imperfect Quality and an Amending Delivery Plan using Algebraic Method
This paper derives the optimal production-shipment policy for a vendor-buyer integrated system with imperfect quality and an amending product delivery plan using an algebraic method. It is assumed that the system may randomly produce certain portion of nonconforming products during each production run. Quality assurance in terms of inspection and rework has been given effect to the defective it...
متن کاملEPQ model with scrap and backordering under Vendor managed inventory policy
This paper presents the economic production quantity (EPQ) models for the imperfect quality items produced with/without the presence of shortage condition. The models are presented in a two-level supply chain composed of a single manufacturer and a single buyer to investigate the performance of vendormanaged inventory (VMI) policy. The total costs are minimized to obtain the optimal production ...
متن کاملDetermining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issues
EPQ model; Replenishment lot size; Multiple deliveries; Random defective items; Production; Rework; Scrap items. Abstract This paper derives the optimal replenishment lot size and shipment policy for an Economic Production Quantity (EPQ) model with multiple deliveries and rework of random defective items. The classic EPQmodel assumes a continuous inventory issuing policy for satisfying demand a...
متن کاملComputational Optimization of Manufacturing Batch Size and Shipment for an Integrated EPQ Model with Scrap
This paper employs mathematical modeling and algebraic approach to derive the optimal manufacturing batch size and number of shipment for a vendor-buyer integrated economic production quantity (EPQ) model with scrap. Unlike the conventional method by using differential calculus to determine replenishment lot size and optimal number of shipments for such an integrated system, this paper proposes...
متن کاملIntegrated JIT Lot-Splitting Model with Setup Time Reduction for Different Delivery Policy using PSO Algorithm
This article develops an integrated JIT lot-splitting model for a single supplier and a single buyer. In this model we consider reduction of setup time, and the optimal lot size are obtained due to reduced setup time in the context of joint optimization for both buyer and supplier, under deterministic condition with a single product. Two cases are discussed: Single Delivery (SD) case, and Multi...
متن کامل