Measurement Scheduling for Recursive Team Estimation 1
نویسنده
چکیده
We consider a decentralized LQG measurement scheduling problem in which every measurement is costly, no communication between observers is permitted, and the observers' estimation errors are coupled quadratically. This setup, motivated by considerations from organization theory, models measurement scheduling problems in which cost, bandwidth, or security constraints necessitate that estimates be decentralized, although their errors are coupled. We show that, unlike the centralized case, in the decentralized case the problem of optimizing the time integral of the measurement cost and the quadratic estimation error is fundamentally stochastic, and we characterize the E-optimal open-loop schedules as chattering solutions of a deterministic Lagrange optimal control problem. Using a numerical example, we describe also how this deterministic optimal control problem can be solved by nonlinear programming.
منابع مشابه
Experiments in the Control of Unbalance Response Using Magnetic Bearings
Unbalance response is a common vibration problem associated with rotating machinery. For several years, researchers have demonstrated that this vibration could be greatly alleviated for machines using active magnetic bearings through active control. Many of the control strategies employed fall into a class which the authors have termed adaptive open loop control. In this paper, three algorithms...
متن کاملEstimation of Parallel Complexity with Rewriting Techniques
We show how monotone interpretations – a termination analysis technique for term rewriting systems – can be used to assess the inherent parallelism of recursive programs manipulating inductive data structures. As a side effect, we show how monotone interpretations specify a parallel execution order, and how our approach extends naturally affine scheduling – a powerful analysis used in paralleli...
متن کاملA Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value
This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA).
In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have ...
متن کاملتخمین پارامترهای مدل کلاسیک ژنراتور با استفاده از داده های PMU
Parameters estimation of dynamic model of synchronous generators is an essential prerequisite for viable and reliable power system operation and offline studies. Advent of phasor measurement units (PMU) and its growing applications in power systems have led to an evolution in the electric power network wide-area monitoring, protection, and control. Alongside, these devices have revealed unprece...
متن کاملA Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value
This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA). In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have be...
متن کامل